Operations Board Pack

Constraint economics, control assurance, TARP status, decision governance, turnaround readiness and forecast trust — assembled from platform records, with the source entity named against every figure.

Production constraint & margin exposure

Source records: FlowsheetStage, CommodityProfile

Governing constraint

Not identified

Rate shortfall vs design

—

Exposure at current rate

—

Assumption: margin $0/unit of throughput from no commodity profile, 24 h/day

Stages not at full rate

0 of 0

Critical control assurance

Source records: SafetyCriticalElement

Controls registered

2

Not fully effective

0

Verification overdue

0

Never assessed

2

Containment, ROW geohazards & TARP status

Source records: TARPlan, TailingsFacility, TailingsAssuranceItem

TARPs above normal

0 of 0

Declared level behind instruments

0

Assurance items open

0 (0 overdue)

Facilities in register

0

Decision & accountability governance

Source records: IntelligenceDecision, OperatingAction

Decisions awaiting approval

2

Implemented, not yet verified

0

Open actions / escalated

0 / 0

Failed verifications

0

Turnaround readiness

Source records: TurnaroundScope

Scopes in planning

0

Fully gated

0

Schedule exceeds window

0

Capital renewal & MOC / PSSR governance

Source records: CapitalPlanItem, ChangeRecord

2027 capital renewal envelope

$245,000

2 FY2027 renewals (0 approved/funded across portfolio)

Total multi-year capital plan

$580,000

MOCs & bypasses registered

0

PSSR & documentation verified

0 of 0

FY2026 — DEMO-CI-C02 · Transfer-pump reliability renewal

Risk score 12/25 · DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Illustrative renewal allowance only; diagnose the seal and vibration baseline before deciding repair versus renewal.

$95,000 (proposed)

FY2027 — DEMO-CI-C01 · TK-J101 coating renewal

Risk score 12/25 · DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Existing DEMO tank snapshot reports local coating breakdown and an assumed NZ$180,000 repair allowance. Confirm extent and independent scope before funding.

$180,000 (proposed)

FY2027 — DEMO-CI-C03 · Overfill evidence and instrumentation review

Risk score 10/25 · DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Review allowance, not a replacement instruction. Obtain approved design basis and proof-test evidence.

$65,000 (proposed)

FY2028 — DEMO-CI-C04 · Pipeline pump efficiency study

Risk score 6/25 · DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Illustrative option allowance; obtain metered energy, verified pump curve and tariff before assessing benefits.

$240,000 (proposed)

Project handover & brownfield acceptance

Source records: AssetAcceptancePassport

Passports registered

0

Accepted into operations

0 of 0

Cryptographically signed (SHA-256)

0 of 0

Revalidation required

0

OGMP 2.0 methane & zero-routine-flaring assurance

Source records: MethaneSource

Sources monitored

0

Active un-repaired leaks

0

OGMP Level 4/5 coverage

—

Total measured rate

0.00 kg/h (0.0 t CH4/yr)

Forecast trust & verified value

Source records: PredictionAccuracy, SavingsLedgerEntry

Scored predictions

0

Claimed vs observed

insufficient scored records

Verified savings

$0

0 entries independently verified

Projected, unverified

$0

0 entries — not yet board-reportable

Constants and assumptions are stated inline. Unverified savings and pending forecasts are reported separately and are not board-reportable value.