Assets & Maintenance
Maintenance
Decision support, portfolio task generation and the portfolio scheduler retain their existing wider scope; they are not restricted by this display filter.
5
Scheduled
0
Overdue
0
Completed
0
Recommended
DEMO-CI-M04 · Locate overfill proof-test evidence
DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Reconcile instrument tag, approved performance standard and signed test record. Record evidence gaps, not an assumed pass.
DEMO-CI-M05 · Confirm pipeline pump duty and standby readiness
DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Review approved duty points, standby availability and isolation arrangements before selecting the maintenance window.
DEMO-CI-M02 · Transfer-pump seal and vibration baseline
DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Collect a repeatable vibration baseline and inspect seal leakage. Compare against verified OEM criteria; no diagnosis or failure date is established.
DEMO-CI-M03 · Ruakākā third-party excavation verification
DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Verify the location, permit and operator confirmation for the demonstration excavation report. Do not authorise excavation from this record.
DEMO-CI-M01 · Confirm TK-J101 coating repair scope
DEMO · Synthetic Channel scenario, snapshot 28 October 2026. All costs are assumed NZD, not quotes or actual expenditure; dates are illustrative planning windows, not approved operating limits. No live telemetry, certification, approval or verified saving. Inspect reported local coating breakdown, record the extent and obtain an integrity engineer review before authorising repairs.