Channel control room · Marsden Point
Terminal & pipeline wall
15:44:02
Thu, 29 Oct · NZ time
SIMULATED telemetry around DEMO set points · not SCADA · no operational authority
Line flow
423 m³/h
Throughput
10.15 ML/d
Transfer pumps
624 kW
Parcels at jetties
52 ML
Open critical / urgent
1 / 3
Value at stake
NZ$1.42M/yr
Marsden–Wiri line flow · last 60 s
Auckland days of cover
What-if →Amber below 7 d watch · red below 2 d minimum
Berths
- DEMO Harbour One12 ML JetJetty 1 · Discharging 50%
- DEMO Harbour Two20 ML DieselJetty 2 · At berth
- DEMO Harbour Three20 ML PetrolJetty 1 · Expected
Alarm & event feed
engine findings + simulated events- 15:35Unverified third-party excavation near Ruakākācritical
- 15:26Transfer pump at 70% efficiency against a 78% targeturgent
- 15:17Auckland jet cover 6.0 days, below the 7-day watch levelurgent
- 15:08Certificate of Fitness audit evidence not attachedurgent
Tank farm
- Jet / SAF45/120 ML · 37.5%
- Diesel / Biofuels60/120 ML · 50%
- Petrol65/120 ML · 54.2%
- Government diesel reserve93/93 ML · 100%
- Ex-refinery0/350 ML · 0%
3 tanks due API 653 internals in 18 months · 6 coating watch
Shift handover