Skip to page content

Channel Intelligence · Marsden Point Terminal

Terminal Command

Demonstration data. Synthetic Marsden Point records as at 28 October 2026, not Channel telemetry, contracts or inspection evidence. Rates and costs are assumptions to confirm with Channel. Connect the terminal management system, historian and SAP PM to replace them.

Pipeline throughput

10.08 ML/d

420 m³/h to Wiri

Auckland jet cover

6.0 d

10.0 d once parcel released

Active capacity

453 ML

170 ML product in stock

Parcels awaiting release

52 ML

3 vessels · Jetty 1 & 2

API 653 due (18 mo)

3 tanks

NZ$588k inspection + repair

Pump energy gap

NZ$92k/yr

623 kW at 70% efficiency

Line fill

8.3 ML

170 km · DN250

Value at stake

NZ$1.42M/yr

1 critical · 3 urgent

Terminal twin

40 tanks sized by capacity and filled to their stock level · flagged tanks pulse · product flows from the jetties to the Wiri line

DEMO Harbour One · 12 ML Jet
DEMO Harbour Two · 20 ML Diesel
→ Wiri · 170 km DN250 line
Jet / SAF · 38%
Diesel / Biofuels · 50%
Petrol · 54%
Government diesel reserve · 100%
Ex-refinery · 0%
Jet / SAFDiesel / BiofuelsPetrolGovernment diesel reserveFlagged
Drag to orbit · scroll to zoom · click a tank · schematic, not surveyed

Tank farm at a glance

453 ML active · 350 ML available to repurpose

Click a tank in the twin to inspect it. Fill by product:

Receipt to airport, live

Each stage is coloured by what the engine found there. Click a stage to open its screen.

What needs attention

Ranked by severity, then annual NZD. Expand for evidence, owner and one-click actions.

Value at stake by area

Annualised NZD across priced findings

Safety, supply and compliance findings are unpriced and rank first regardless.

Auckland days of cover

Today, and once inbound parcels are released

What-if: the Marsden–Wiri line stops

Auckland cover by product over 14 days. After restart, supply runs at demand plus a catch-up surplus until cover is rebuilt. Move the levers; the model reruns instantly.

Jetmin 3.0 d
Dieselmin 3.0 d
Petrolmin 3.0 d

All products hold the 2-day minimum.

Shaded: line down. Inbound parcels count only once released. Tanker payload 36 m³; restart catch-up 25% above demand (assumed). Screening model, not an operating plan. For the full strike scenario open Ruakākā strike scenario.