Vessel-to-airport continuity
Connect marine receipts, terminal storage, the Wiri pipeline and customer interfaces without double-counting fuel stocks.
Channel Infrastructure · Marsden Point Terminal · DEMO
Chapter 04
API 653-style inspection records, repurposing readiness and a 10-year NZD cost outlook.
Marsden Point to Wiri, with a Ruakākā strike scenario and airport jet cover.
Product cover, inbound vessels and a separately controlled government diesel reserve.
Maintenance capital discipline and a Certificate of Fitness evidence checklist.
Inside the platform
Readiness passport · DEMO — SAG mill reline
Turnaround · release blocked until all mandatory evidence is accepted
Safety & statutory
6/6
ReadyTechnical
4/5
Open itemsExecution
3/5
Open itemsProduction
2/2
ReadyIntegrated operating model
Connect marine receipts, terminal storage, the Wiri pipeline and customer interfaces without double-counting fuel stocks.
Bring tanks, jetties, loading arms, fire systems, pumps and pipeline corridors into one engineering picture.
Review API 653-style records, thickness trends, settlement, coatings and inspection allowances.
Define tank conversion scope, customer constraints and evidence required for safe return to service.
Expose maintenance capex and avoided-outage assumptions, separating estimates from verified savings.
Apply governed handover to SAF, biofuels, LNG and flow-battery asset pathways.
Keep inspections, patrol findings, defects and accountable work linked to source evidence.
Organise Certificate of Fitness surveillance evidence and applicable tank, pipeline and environmental requirements.
Enter the Command Center
Move from fragmented functional reports to a governed resources operating picture with accountable action and verified value.
Open Command Center