Energy Precinct · future asset onboarding

Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
Future pathway, not an approved investment or commissioned facility. The brief identifies 45 ha of consented land, a 25% Somerton jet-pipeline stake (November 2025), and a 120 ML tank opening on 8 July 2026; these details require source confirmation before external presentation.
DEMO roadmap · Future onboarding

SAF

Fuel qualification, segregation, material compatibility and traceable release.
  1. Define asset scope, ownership and consent basis.
  2. Import verified drawings, manuals and asset register.
  3. Agree criticality, spares and maintenance strategy.
  4. Complete commissioning evidence and human release.
  5. Verify operating performance against approved criteria.
DEMO roadmap · Future onboarding

Biofuels

Blend compatibility, seals, water control, microbial monitoring and tank-cleaning requirements.
  1. Define asset scope, ownership and consent basis.
  2. Import verified drawings, manuals and asset register.
  3. Agree criticality, spares and maintenance strategy.
  4. Complete commissioning evidence and human release.
  5. Verify operating performance against approved criteria.
DEMO roadmap · Future onboarding

LNG import

New cryogenic assets, process-safety assessment, emergency arrangements and consent review.
  1. Define asset scope, ownership and consent basis.
  2. Import verified drawings, manuals and asset register.
  3. Agree criticality, spares and maintenance strategy.
  4. Complete commissioning evidence and human release.
  5. Verify operating performance against approved criteria.
DEMO roadmap · Future onboarding

Flow battery

Electrical protection, electrolyte containment, fire response and performance verification.
  1. Define asset scope, ownership and consent basis.
  2. Import verified drawings, manuals and asset register.
  3. Agree criticality, spares and maintenance strategy.
  4. Complete commissioning evidence and human release.
  5. Verify operating performance against approved criteria.

Tank and bitumen handover boundaries

The synthetic jet compound totals 120 ML with 45 ML in service. A real handover pack must include design approval, weld/NDT records, settlement baseline, leak tests, API 2350 overfill proof tests, fire-system checks, product-quality release and signed acceptance. Higgins is a separately owned facility; confirm interface responsibilities.