Skip to page content
Channel × AssetStack · Marsden Point Terminal

Channel pipeline defects · illustrative 3D review

Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
Saved synthetic ILI loss
77.0% WT
Not measured condition
Saved axial length
250 mm
Width and surface are display assumptions
Calculated burst screening
110.8 bar
Not an allowable operating pressure
Burst / saved pressure ratio
1.35
Saved pressure basis: 82.0 barg · unverified
77.0% WT · 05:30

DEMO-CI-ILI-001 · External metal loss · illustrative shape

250.0 mm OD × 7.9 mm WT X52 · assumed · km 4.5 · GW 1020

Wall loss drawn ×3 so it is visible. Drag to orbit, scroll to zoom.

Remaining wall100%

Representative smooth geometry, not an actual ILI scan or field reconstruction. Width defaults to an invented 50 mm; external/internal location is not supplied by this saved record. Neither display choice changes the axial metal-loss calculation. Colour indicates drawn remaining wall, not an operating risk classification.

Assumed depth projection · from 28 October 2026

Depth = saved run3_depth_pct + assumed growth × years, capped at 100% for plotting only. No repair deadline, remaining-life claim or statutory threshold is inferred.

Screening formula and applicability limits

Reuses the existing Modified B31G implementation: flow stress = SMYS + 68.95 MPa, effective area factor 0.85, z = L²/(D×t); Folias factor M = √(1 + 0.6275z − 0.003375z²) for z ≤ 50, otherwise 0.032z + 3.3. MPa × 10 = bar. The implementation rounds pressure to 0.01 MPa and floors it at 0.5 MPa. FPR = calculated pressure / saved maop_mpa. No generic acceptance or repair threshold is applied.

The 2% WT/year starting rate is an uncalibrated browser assumption, not a fitted rate from these runs. Projection dates start at 28 October 2026, not today. Missing inputs and projected depths ≥95% are not evaluated; do not extrapolate a capped curve as safe. Interaction, cracks, dents, seams, toughness, cyclic duty, uncertainty and actual repair acceptance are excluded. The accountable engineer must determine method applicability and the approved integrity criteria.

Saved source and accountable verification
Record
6ae23fbde1248ff3d456e283
Feature
DEMO-CI-ILI-001
Pipeline
DEMO · Marsden Point–Wiri
Clock position
05:30
Coating / soil
Unknown · verify coating record / NZ corridor · soil study required
Dig status
not_planned
Saved field UT depth
Not supplied
Latest update
2026-10-28T18:32:29.828000

DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Assumed matched runs 2018-10-28 / 2022-10-28 / 2026-10-28; diameters, grade, SMYS, wall and feature dimensions are synthetic. No field dig verification supplied.

The pipeline integrity engineer must confirm vendor matching, material / dimension certificates, the pressure basis and field NDT before deciding on an intervention. Excavation requires approved location, access, isolation and permits; no map or visualisation here locates a real feature. After work, an independent competent verifier must accept repair QA and the approved inspection / test results before operations authorises return to service; retain signed evidence and update the integrity plan.

Open this feature in the ILI register
Open this feature’s local DEMO field draft