Channel value flow · marine receipt to dispatch

Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.

Terminal service and supply-chain timing, not upstream gas processing or commodity trading. Parcel volumes come from the existing DEMO vessel fixtures; dispatch splits and interruption timing below are assumptions.

Single-parcel dispatch assumptions

This 12 ML parcel only; not daily throughput, total tank inventory or an actual nomination. Starting allocations assume 70% pipeline, 10% road and 20% retained; a 24-hour window and six-hour interruption are illustrative.

DEMO parcel · Jet
12.000 ML
DEMO-V01 · synthetic fixture
Pipeline dispatch deferred
2.100 ML
Retained, not destroyed or automatically lost sales
Parcel held at window end
4.500 ML
No working-ullage or tank capacity check
Variable-fee timing exposure
Not priced
Not fuel value, permanent revenue loss or verified savings

Marine receipt → dispatch or retention

Band width represents ML from this one parcel, not financial value. Deferred fuel remains held; it is not a leak, physical loss or additional supply.

Pipeline dispatched
6.300 ML
Road dispatched
1.200 ML
Planned retention
2.400 ML
Deferred pipeline parcel
2.100 ML

Balance: 12.000 ML receipt = 7.500 ML dispatched + 4.500 ML held, including 2.100 ML deferred pipeline dispatch. No evaporation, measurement adjustment or fuel loss is assumed.

Constraint → response → verification

This scenario assumes uniform dispatch over the entered transfer window. It does not diagnose a real pipeline constraint.

Check the actual nomination, pump duty, integrity restrictions and available transfer window before rescheduling.

Accountable verification

Pipeline operations should reconcile metered delivered volume and the customer nomination after restart; finance should confirm whether deferred service was recovered.

Review liquid-pressure assumptions
Source, formula and commercial boundary

Source: synthetic vessel fixture DEMO-V01, parcel 12 ML, product Jet, arrival 2026-10-28, berth Jetty 1, snapshot 2026-10-28. Selecting a vessel resets this browser-only scenario. Nothing is persisted to nominations or the value ledger.

Deferred ML = planned pipeline ML × min(interruption hours / planned window hours, 1). Pipeline dispatched = planned pipeline ML − deferred ML. Planned retention = parcel − planned pipeline ML − road ML. Held parcel = planned retention + deferred ML. Assumes uniform transfer, no catch-up, independent road dispatch and no physical product loss. Pressure, pump limits, batch sequencing, shore receipt rate, vessel demurrage, actual tank ullage and alternative nominations are not solved.

Optional variable-fee timing exposure = deferred ML × user-entered NZD/ML tariff. The tariff is unknown until entered; zero is an explicit zero-rate assumption. No contract entitlement, fuel-ownership margin, fixed storage revenue loss, demurrage, penalties or annualisation is inferred. Deferral may be recovered later; finance must reconcile contractual terms and actual outcomes before recording a benefit or loss.

Open the separate NZ value and Certificate of Fitness review