Terminal energy, carbon & VOC boundaries
| Stream · DEMO | Boundary | Annual quantity | Assumed factor | t CO₂e / year | Energy NZD/year | Basis |
|---|---|---|---|---|---|---|
| DEMO-CI-E01 · Marsden terminal electricity | Scope 2 · Purchased electricity | 2,400,000 kWh | 0.1 kg CO₂e/kWh | 240.0 | NZ$480,000 | Source & gapsDEMO · annual scenario quantities, NZD prices and emission factors. Not metered data, official NZ factors, consent evidence or verified savings. Factor vintage is unverified; replace with reporting-year NZ factors and an approved inventory boundary. Electricity factor assumed 0.10 kg CO2e/kWh, energy price NZ$0.20/kWh; location-based Scope 2 only. Record: 6ae2416a6716ed279f147664. Factor × annual quantity ÷ 1,000 = tonnes. Quantity × unit cost = NZD. |
| DEMO-CI-E02 · Pipeline pumping electricity | Scope 2 · Purchased electricity | 8,400,000 kWh | 0.1 kg CO₂e/kWh | 840.0 | NZ$1,512,000 | Source & gapsDEMO · annual scenario quantities, NZD prices and emission factors. Not metered data, official NZ factors, consent evidence or verified savings. Factor vintage is unverified; replace with reporting-year NZ factors and an approved inventory boundary. Assumed 0.10 kg CO2e/kWh and NZ$0.18/kWh. No ownership claim is made over customer-owned terminal or truck-rack loads. Record: 6ae2416a6716ed279f147665. Factor × annual quantity ÷ 1,000 = tonnes. Quantity × unit cost = NZD. |
| DEMO-CI-E03 · Standby generator diesel | Scope 1 · Direct combustion | 35,000 litres | 2.68 kg CO₂e/litres | 93.8 | NZ$73,500 | Source & gapsDEMO · annual scenario quantities, NZD prices and emission factors. Not metered data, official NZ factors, consent evidence or verified savings. Factor vintage is unverified; replace with reporting-year NZ factors and an approved inventory boundary. Assumed combustion-only 2.68 kg CO2e/litre and NZ$2.10/litre. Upstream fuel-cycle, customer product combustion, tank VOCs and refrigerants are excluded, not zero. Record: 6ae2416a6716ed279f147666. Factor × annual quantity ÷ 1,000 = tonnes. Quantity × unit cost = NZD. |
Pumping-efficiency scenario · not verified savings
Assumed reduction applies only to loaded electricity streams, at unchanged throughput and unit prices. Shadow value is not an ETS liability, tradable credit, cash saving or additional booked benefit. Verify before funding.
Inventory boundaries, VOCs and verification
Synthetic annual quantities, factors and prices, not an official or verified inventory. No standard factor fallback is applied. Electricity is location-based Scope 2; standby diesel is direct Scope 1 combustion. A renewable grid share is not used to zero emissions. Missing sources remain unquantified, not zero.
Tank breathing, loading losses, VOCs, refrigerants and customer fuel use are outside this calculation. VOCs are not silently converted into CO₂e or called methane. Establish product-specific vapour pressure, tank/roof/seal configuration, throughput, vapour recovery and consent conditions before estimating or assessing compliance.
The energy/environment lead should reconcile meter and invoice data, NZ factor vintage and reporting boundary. After pump-control changes, compare metered kWh per ML transferred against a throughput-normalised baseline over an agreed period; retain meter calibration, operating conditions and independent finance/environment review.