Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
5 loaded of 5 · calculations apply to loaded records
Loaded systems assessed
4 / 5
High / very-high screening risk
2
Modelled dates before today
0
Missing thickness evidence
1
SystemRate mm/yrRemaining life yrL × CRiskInterval yrNext inspection

DEMO · Jetty 1 product transfer line

DEMO-CI-JT-01 · AS 2885.3 / applicable piping code · confirm basis · rate: two-point synthetic

Assumptions & source readings
2022-03-16: 6.6 mm → 2026-03-16: 6.1 mm
Assumed minimum: 5.8 mm; interval cap: 5 yr
Marine atmospheric corrosion · Pipeline integrity engineer
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Thicknesses and five-year interval cap are assumptions, not actual readings or statutory maxima.
DEMO status out_of_service prevents any implied operating clearance. No fitness-for-service decision. Retain repeat accepted NDT, coating/settlement or pressure-test QA as applicable and signed return-to-service acceptance.
Source: 6ae23fbd713e4798a88f3528
0.1252.44 × 4very high1.02027-03-16

DEMO · Pipeline pump manifold

DEMO-CI-PM-01 · AS 2885.3 / applicable piping code · confirm basis · rate: two-point synthetic

Assumptions & source readings
2022-03-16: 7.4 mm → 2026-03-16: 6.9 mm
Assumed minimum: 6 mm; interval cap: 5 yr
Localised corrosion · Pipeline integrity engineer
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Thicknesses and five-year interval cap are assumptions, not actual readings or statutory maxima.
DEMO status out_of_service prevents any implied operating clearance. No fitness-for-service decision. Retain repeat accepted NDT, coating/settlement or pressure-test QA as applicable and signed return-to-service acceptance.
Source: 6ae23fbd713e4798a88f352a
0.1257.23 × 3high3.02029-03-15

DEMO · Northern pipeline review section

DEMO-CI-PL-N01 · AS 2885.3 / applicable piping code · confirm basis · rate: two-point synthetic

Assumptions & source readings
2022-03-16: 7.2 mm → 2026-03-16: 6.7 mm
Assumed minimum: 5.2 mm; interval cap: 5 yr
External corrosion / coating damage · Pipeline integrity engineer
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Thicknesses and five-year interval cap are assumptions, not actual readings or statutory maxima.
DEMO status out_of_service prevents any implied operating clearance. No fitness-for-service decision. Retain repeat accepted NDT, coating/settlement or pressure-test QA as applicable and signed return-to-service acceptance.
Source: 6ae23fbd713e4798a88f3527
0.12512.02 × 3medium5.02031-03-16

DEMO · Reserve tank shell review

DEMO-CI-TK-R101 · API 653-style screening · applicability unconfirmed · rate: two-point synthetic

Assumptions & source readings
2022-03-16: 8.2 mm → 2026-03-16: 7.9 mm
Assumed minimum: 6 mm; interval cap: 5 yr
External coating breakdown · Tank integrity engineer
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Thicknesses and five-year interval cap are assumptions, not actual readings or statutory maxima.
DEMO status out_of_service prevents any implied operating clearance. No fitness-for-service decision. Retain repeat accepted NDT, coating/settlement or pressure-test QA as applicable and signed return-to-service acceptance.
Source: 6ae23fbd713e4798a88f3529
0.07525.31 × 3low5.02031-03-16

DEMO · Repurposing tank evidence gap

DEMO-CI-TK-X101 · API 653-style screening · applicability unconfirmed · rate: insufficient readings

Assumptions & source readings
Undated: — mm → 2026-03-16: 7.8 mm
Assumed minimum: missing mm; interval cap: 5 yr
Damage mechanism unconfirmed · Tank integrity engineer
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Thicknesses and five-year interval cap are assumptions, not actual readings or statutory maxima.
DEMO status out_of_service prevents any implied operating clearance. No fitness-for-service decision. Retain repeat accepted NDT, coating/settlement or pressure-test QA as applicable and signed return-to-service acceptance.
Source: 6ae23fbd713e4798a88f352b
No data: needs two dated thickness readings (or an engineer rate) plus minimum required thickness.
Method, limits and inspection acceptance

DEMO two-point rate = thickness change ÷ elapsed years. Remaining life = (latest − assumed minimum) ÷ rate; no observed loss does not prove indefinite life. Likelihood brackets are <2 / <5 / <10 / <20 years. Consequence is an assumed record class, not an approved study. Interval = minimum of half remaining life, 10 / 5 / 3 / 1-year risk caps and the record maximum. These are illustrative API 580-style screens, not API 581 calculations, adopted API 653 intervals or statutory determinations. Dates are calculated from each synthetic inspection date; overdue comparison uses today.

The tank/pipeline integrity engineer must verify minimum thickness, measurement quality, applicable standards, licence conditions and approved intervals. After work, retain accepted repeat NDT and coating/settlement or pressure-test evidence as applicable; update the approved plan only after accountable review. The unassessed record deliberately demonstrates missing evidence.