Channel × AssetStack · Marsden Point Terminal

Wiri pipeline · cathodic protection survey

Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
12 loaded of 12 · calculations apply to loaded records
6 loaded of 6 · calculations apply to loaded records
Off-potential flags · test points
6
AC screening flags · test points
4
Nearby ILI features to investigate
4

CP potentials and external metal loss · synthetic chainage

0 km45 km90 km170 km-1400 mV-1150 mV-900 mV-650 mV-400 mV0% WT25% WT50% WT75% WT100% WT
  • On potential · mV CSE
  • Instant-off · mV CSE
  • ILI depth · % WT

Lines connect sparse DEMO test points, not a continuous CIPS survey or protected route length. Reference line is an adjustable screening assumption.

Reading · DEMOChainageDateOn / off mV CSEAC VDCVG %IRReview evidence
DEMO-CI-CP-001-14.5 km2026-10-28-1190 / -760732
Screening flag · 2 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-001 · 77% WTDEMO-CI-ILI-002 · 48% WT
DEMO-CI-CP-001-24.6 km2026-10-28-1175 / -750832
Screening flag · 2 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-001 · 77% WTDEMO-CI-ILI-002 · 48% WT
DEMO-CI-CP-002-14.7 km2026-10-28-1155 / -98059
Review record · 2 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-001 · 77% WTDEMO-CI-ILI-002 · 48% WT
DEMO-CI-CP-002-24.8 km2026-10-28-1140 / -97069
Review record · 1 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-002 · 48% WT
DEMO-CI-CP-003-120.2 km2026-10-28-1120 / -104046
Review record · 1 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-003 · 35% WT
DEMO-CI-CP-003-220.3 km2026-10-28-1105 / -103056
Review record · 1 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-003 · 35% WT
DEMO-CI-CP-004-175 km2026-10-28-1085 / -7901822
Screening flag · 1 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-004 · 58% WT
DEMO-CI-CP-004-275.1 km2026-10-28-1070 / -7801922
Screening flag · 1 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-004 · 58% WT
DEMO-CI-CP-005-1142.5 km2026-10-28-1050 / -8102328
Screening flag · 1 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-005 · 68% WT
DEMO-CI-CP-005-2142.6 km2026-10-28-1035 / -8002428
Screening flag · 1 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-ILI-005 · 68% WT
DEMO-CI-CP-006-1168.3 km2026-10-28-1015 / -99065
Review record · 0 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
DEMO-CI-CP-006-2168.4 km2026-10-28-1000 / -98075
Review record · 0 nearby ILI feature(s)
DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Sparse synthetic test point, not a CIPS survey.
CP engineer: verify electrode calibration, synchronised interruption, IR drop, soil resistivity, rectifier logs and AC/DC current density. Repeat accepted measurements after work and retain signed QA.
Limits, causation and verification

−850 mV CSE, 15 V AC and 15% DCVG IR are DEMO screening assumptions, not adopted Channel criteria. ISO 15589-1 / AMPP SP0169 selection requires the approved CP basis and environmental conditions; ISO 18086 AC-corrosion assessment needs current density, not voltage alone. Coincidence is ±250 m with ≥30% WT loss; it does not prove active corrosion or a causal connection. No protected kilometre estimate is inferred from sparse points.

Before selecting excavation, the CP engineer must verify electrode calibration, synchronised interruption, IR-drop correction, soil resistivity, rectifier records and AC/DC current density. After rectifier or coating work, repeat accepted CP measurements and retain calibration, readings, coating QA and accountable sign-off.