Channel × AssetStack · Marsden Point Terminal
Terminal & customer interfaces · handover evidence
Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
4 loaded of 4 · calculations apply to loaded records
Requirements in selected pack
8
Illustrative sources, not accepted
0
Missing source records
8
DEMO-CI-COF · No verified acceptance
Certificate of Fitness · surveillance evidence gaps
Evidence-gap pack only. Five-year certificate and annual surveillance context are brief-supplied, not verified dates or a compliance opinion. No certificate, surveillance report or accepted close-out is attached.
Missing source · Current certificate and defined scope
- Review reference
- HSE (Pipelines) Regulations 1999 / current certificate
- Acceptance to demonstrate
- Supply the current certificate, issuer, scope, conditions and validity dates and confirm applicability.
- Accountable reviewer
- Pipeline asset owner
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Annual surveillance and actions
- Review reference
- Approved inspection-body surveillance requirements
- Acceptance to demonstrate
- Supply the latest surveillance report and independently accepted action close-outs.
- Accountable reviewer
- Compliance lead
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · ILI matching and integrity assessment
- Review reference
- Approved AS 2885.3 integrity plan
- Acceptance to demonstrate
- Verify actual matched feature data, assessment method, repair criteria and engineering acceptance; DEMO screening is not evidence.
- Accountable reviewer
- Pipeline integrity engineer
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · CP survey and calibration
- Review reference
- Approved CP basis / applicable ISO 15589-1 and AMPP criteria
- Acceptance to demonstrate
- Retain actual calibrated survey data, interference studies and accepted mitigation verification.
- Accountable reviewer
- CP engineer
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Patrols and third-party works
- Review reference
- Approved corridor-management and permit procedures
- Acceptance to demonstrate
- Reconcile actual patrol logs, excavation notices, permits and close-outs.
- Accountable reviewer
- Pipeline supervisor
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Repairs and pressure-integrity records
- Review reference
- Approved repair design and return-to-service requirements
- Acceptance to demonstrate
- Retain measured NDT, repair QA, relevant pressure tests and accountable return-to-service acceptance.
- Accountable reviewer
- Pipeline integrity engineer
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Competency and emergency exercises
- Review reference
- Approved competency and emergency-response plans
- Acceptance to demonstrate
- Confirm responsible competencies, exercise outcomes and corrective-action closure.
- Accountable reviewer
- Operations manager
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Independent audit readiness decision
- Review reference
- Approved assurance delegation
- Acceptance to demonstrate
- Reconcile scope, exceptions and all source records before an accountable reviewer declares audit readiness.
- Accountable reviewer
- Independent assurance reviewer
- Source
- Not supplied. No inspected document or accepted result is attached.
Asset reference: Marsden Point–Wiri pipeline · DEMO review · Snapshot: 2026-10-28 · Pack record: 6ae2416a2d7be82dac22c41e. References indicate review topics, not proof of applicability or certification.
From a DEMO checklist to governed acceptance
These public packs contain synthetic scope and missing-evidence requirements only. They are not approved handovers, audit evidence or authority to operate. Actual passports use the existing administrator workspace with distinct nominated owner and independent approver, source-linked reviews and commissioning acceptance.
Final signed acceptance creates a stored evidence snapshot and requires integration credits; these public checklists and private planning drafts do not.