Skip to page content
Channel × AssetStack · Marsden Point Terminal

Channel handover · public demonstration

Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.

Governed passports require administrator access. Sign in

4 loaded of 4 · calculations apply to loaded records
Requirements in selected pack
8
Illustrative sources, not accepted
0
Missing source records
8
DEMO-CI-COF · No verified acceptance

Certificate of Fitness · surveillance evidence gaps

Evidence-gap pack only. Five-year certificate and annual surveillance context are brief-supplied, not verified dates or a compliance opinion. No certificate, surveillance report or accepted close-out is attached.

Missing source · Current certificate and defined scope
Review reference
HSE (Pipelines) Regulations 1999 / current certificate
Acceptance to demonstrate
Supply the current certificate, issuer, scope, conditions and validity dates and confirm applicability.
Accountable reviewer
Pipeline asset owner
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Annual surveillance and actions
Review reference
Approved inspection-body surveillance requirements
Acceptance to demonstrate
Supply the latest surveillance report and independently accepted action close-outs.
Accountable reviewer
Compliance lead
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · ILI matching and integrity assessment
Review reference
Approved AS 2885.3 integrity plan
Acceptance to demonstrate
Verify actual matched feature data, assessment method, repair criteria and engineering acceptance; DEMO screening is not evidence.
Accountable reviewer
Pipeline integrity engineer
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · CP survey and calibration
Review reference
Approved CP basis / applicable ISO 15589-1 and AMPP criteria
Acceptance to demonstrate
Retain actual calibrated survey data, interference studies and accepted mitigation verification.
Accountable reviewer
CP engineer
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Patrols and third-party works
Review reference
Approved corridor-management and permit procedures
Acceptance to demonstrate
Reconcile actual patrol logs, excavation notices, permits and close-outs.
Accountable reviewer
Pipeline supervisor
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Repairs and pressure-integrity records
Review reference
Approved repair design and return-to-service requirements
Acceptance to demonstrate
Retain measured NDT, repair QA, relevant pressure tests and accountable return-to-service acceptance.
Accountable reviewer
Pipeline integrity engineer
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Competency and emergency exercises
Review reference
Approved competency and emergency-response plans
Acceptance to demonstrate
Confirm responsible competencies, exercise outcomes and corrective-action closure.
Accountable reviewer
Operations manager
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Independent audit readiness decision
Review reference
Approved assurance delegation
Acceptance to demonstrate
Reconcile scope, exceptions and all source records before an accountable reviewer declares audit readiness.
Accountable reviewer
Independent assurance reviewer
Source
Not supplied. No inspected document or accepted result is attached.
Asset reference: Marsden Point–Wiri pipeline · DEMO review · Snapshot: 2026-10-28 · Pack record: 6ae2416a2d7be82dac22c41e. References indicate review topics, not proof of applicability or certification.

From a DEMO checklist to governed acceptance

These public packs contain synthetic scope and missing-evidence requirements only. They are not approved handovers, audit evidence or authority to operate. Actual passports use the existing administrator workspace with distinct nominated owner and independent approver, source-linked reviews and commissioning acceptance.

Final signed acceptance creates a stored evidence snapshot and requires integration credits; these public checklists and private planning drafts do not.