Channel × AssetStack · Marsden Point Terminal

Wiri pipeline · ILI features & dig review

Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
Modified B31G · NZ DEMO screening, not a compliance assessment
2018 / 2022 / 2026 synthetic matched runs; latest at 28 October 2026.
6 loaded of 6 · calculations apply to loaded records
3 loaded of 3 · calculations apply to loaded records
Features in this screening
6
Review before next pig run
1
Immediate screening flags
0
FeatureChainageDepth %WTGrowth %WT/yrBurst MPaFPRScreening windowCategoryDig statusEvidenceBefore next pig run?

DEMO-CI-ILI-001

DEMO · Ruakākā town-proximity review · HCA (residential) — DEMO HCA review · Ruakākā

4.5 km771.8111.081.35606 (2028-06-25)Priority Dig Plan (<2 yr)
Source & verification

DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Assumed matched runs 2018-10-28 / 2022-10-28 / 2026-10-28; diameters, grade, SMYS, wall and feature dimensions are synthetic. No field dig verification supplied.

DEMO run depths: 65 / 71 / 77% WT. Assumed OD 250 mm; WT 7.9 mm; SMYS 359 MPa; pressure basis 82 barg. Source record: 6ae23fbde1248ff3d456e283.

Confirm field NDT, coating and CP evidence; accountable engineering approval and signed post-repair acceptance remain required.

Review intervention window

DEMO-CI-ILI-005

DEMO · Auckland urban corridor review · HCA (high_density) — DEMO HCA review · Auckland urban approach

142.5 km681.8113.391.632416 (2033-06-09)Monitored (Next ILI)
Source & verification

DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Assumed matched runs 2018-10-28 / 2022-10-28 / 2026-10-28; diameters, grade, SMYS, wall and feature dimensions are synthetic. No field dig verification supplied.

DEMO run depths: 56 / 62 / 68% WT. Assumed OD 250 mm; WT 7.9 mm; SMYS 359 MPa; pressure basis 82 barg. Source record: 6ae23fbde1248ff3d456e287.

Confirm field NDT, coating and CP evidence; accountable engineering approval and signed post-repair acceptance remain required.

Not flagged in this screen

DEMO-CI-ILI-004

DEMO · Kaipara catchment crossing review · HCA (environmental) — DEMO HCA review · Kaipara catchment

75 km581.8115.851.934431 (2038-12-15)Monitored (Next ILI)
Source & verification

DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Assumed matched runs 2018-10-28 / 2022-10-28 / 2026-10-28; diameters, grade, SMYS, wall and feature dimensions are synthetic. No field dig verification supplied.

DEMO run depths: 46 / 52 / 58% WT. Assumed OD 250 mm; WT 7.9 mm; SMYS 359 MPa; pressure basis 82 barg. Source record: 6ae23fbde1248ff3d456e286.

Confirm field NDT, coating and CP evidence; accountable engineering approval and signed post-repair acceptance remain required.

Not flagged in this screen

DEMO-CI-ILI-002

DEMO · Ruakākā town-proximity review · HCA (residential) — DEMO HCA review · Ruakākā

4.7 km481.8118.332.246442 (2044-06-17)Monitored (Next ILI)
Source & verification

DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Assumed matched runs 2018-10-28 / 2022-10-28 / 2026-10-28; diameters, grade, SMYS, wall and feature dimensions are synthetic. No field dig verification supplied.

DEMO run depths: 36 / 42 / 48% WT. Assumed OD 250 mm; WT 7.9 mm; SMYS 359 MPa; pressure basis 82 barg. Source record: 6ae23fbde1248ff3d456e284.

Confirm field NDT, coating and CP evidence; accountable engineering approval and signed post-repair acceptance remain required.

Not flagged in this screen

DEMO-CI-ILI-003

DEMO · Waipu crossing review · DEMO review area · classification unapproved

20.2 km351.8121.432.619063 (2051-08-21)Monitored (Next ILI)
Source & verification

DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Assumed matched runs 2018-10-28 / 2022-10-28 / 2026-10-28; diameters, grade, SMYS, wall and feature dimensions are synthetic. No field dig verification supplied.

DEMO run depths: 23 / 29 / 35% WT. Assumed OD 250 mm; WT 7.9 mm; SMYS 359 MPa; pressure basis 82 barg. Source record: 6ae23fbde1248ff3d456e285.

Confirm field NDT, coating and CP evidence; accountable engineering approval and signed post-repair acceptance remain required.

Not flagged in this screen

DEMO-CI-ILI-006

DEMO · Wiri receipt approach review · DEMO review area · classification unapproved

168.3 km221.8124.322.9710950 (2056-10-20)Monitored (Next ILI)
Source & verification

DEMO · synthetic Channel scenario at 2026-10-28. Not actual telemetry, survey geometry, inspection evidence or design data. Assumed matched runs 2018-10-28 / 2022-10-28 / 2026-10-28; diameters, grade, SMYS, wall and feature dimensions are synthetic. No field dig verification supplied.

DEMO run depths: 10 / 16 / 22% WT. Assumed OD 250 mm; WT 7.9 mm; SMYS 359 MPa; pressure basis 82 barg. Source record: 6ae23fbde1248ff3d456e288.

Confirm field NDT, coating and CP evidence; accountable engineering approval and signed post-repair acceptance remain required.

Not flagged in this screen

DEMO dig shortlist · NZD

2 of 5 clusters within scenario budget · NZ$275,000 allowance · NZ$85,000 modelled shared-mobilisation difference
Within budget · DEMO · Ruakākā town-proximity review
4.50–4.70 km · 2 feature(s) · earliest screening window 606 d
NZ$155,000
Priority score 16
Within budget · DEMO · Auckland urban corridor review
142.50 km · 1 feature(s) · earliest screening window 2416 d
NZ$120,000
Priority score 8
Outside budget · DEMO · Kaipara catchment crossing review
75.00 km · 1 feature(s) · earliest screening window 4431 d
NZ$120,000
Priority score 8
Outside budget · DEMO · Waipu crossing review
20.20 km · 1 feature(s) · earliest screening window 9063 d
NZ$120,000
Priority score 5
Outside budget · DEMO · Wiri receipt approach review
168.30 km · 1 feature(s) · earliest screening window 10950 d
NZ$120,000
Priority score 5

Direct NZD scenario allowances, not converted USD or contractor quotes. Greedy risk-per-dollar ranking, not a guaranteed optimum. Features within 1 km share mobilisation in the model; this does not prove they share a physical excavation. Synthetic HCA matches carry a 1.6× assumption. Mandatory interventions remain mandatory even when outside this budget. No work is approved or released.

Screening assumptions and verification

Synthetic geometry, grade and depths are not as-built evidence. FPR limits 1.10 / 1.25 and 80% WT are DEMO assumptions, not NZ statutory criteria. The inherited growth model uses a fallback prior of 2.0 ± 0.6% WT/year, four-year spacing and 6.2% WT tool noise; these have not been calibrated for Channel. The time-to-limit search steps by 0.05 years, up to 30 years. Dates start from the fixed DEMO snapshot, not today. No gas potential-impact-radius model is used here.

An accountable pipeline engineer must confirm vendor matching, material certificates, measured dimensions, pressure basis, CP and coating evidence and the approved AS 2885.3 integrity plan. Confirm by field NDT before selecting an intervention; retain accepted measurements, repair QA and signed return-to-service evidence. Status changes alone do not prove repair acceptance.