Channel × AssetStack · Marsden Point Terminal
Tank repurposing · conversion planning
Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
Six evidence gates · all unverified
Missing evidence · Product compatibility
Confirm fuel specification, coating, seal/elastomer compatibility, water control and segregation.
Accountable review: Product quality lead
Missing evidence · Tank integrity
Verify geometry, internal inspection/NDT, settlement baseline and approved API 653 repair basis.
Accountable review: Tank integrity engineer
Missing evidence · Cleaning & isolation
Approve product movement, gas-free testing, confined-space controls, permits and waste route.
Accountable review: Operations supervisor
Missing evidence · Fire & overfill barriers
Verify approved fire-water/foam strategy and API 2350-style independent overfill proof-test evidence.
Accountable review: Process-safety engineer
Missing evidence · Customer & consent interfaces
Confirm customer allocations, reserve restrictions, connection ownership and applicable consents.
Accountable review: Operations / environment lead
Missing evidence · Return to service
Retain accepted coating/leak tests, product-quality release and independent signed commissioning acceptance.
Accountable review: Accountable asset owner
A saved draft does not reserve capacity, authorise funding, approve an outage or release a tank. Product demand, customer allocation and reserve effects require a separate operating plan. Demonstrate cleaning, integrity, barrier, quality and commissioning acceptance before release.