Channel × AssetStack · Marsden Point Terminal

Tank repurposing · conversion planning

Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.

Tank conversion scenario · draft only

Base allowance
NZ$400,000
Including contingency
NZ$480,000
Assumed return date
2027-05-16

DEMO allowances only, excluding GST, financing, shared infrastructure and lost capacity effects. Total = cleaning + inspection + modification, multiplied by (1 + contingency %). Proposed duration is calendar days from the start, not an approved schedule or a guaranteed completion date.

Saved drafts are private to their creator and app administrators; administrators can read and change all drafts. No evidence is marked accepted.

Six evidence gates · all unverified

Missing evidence · Product compatibility
Confirm fuel specification, coating, seal/elastomer compatibility, water control and segregation.
Accountable review: Product quality lead
Missing evidence · Tank integrity
Verify geometry, internal inspection/NDT, settlement baseline and approved API 653 repair basis.
Accountable review: Tank integrity engineer
Missing evidence · Cleaning & isolation
Approve product movement, gas-free testing, confined-space controls, permits and waste route.
Accountable review: Operations supervisor
Missing evidence · Fire & overfill barriers
Verify approved fire-water/foam strategy and API 2350-style independent overfill proof-test evidence.
Accountable review: Process-safety engineer
Missing evidence · Customer & consent interfaces
Confirm customer allocations, reserve restrictions, connection ownership and applicable consents.
Accountable review: Operations / environment lead
Missing evidence · Return to service
Retain accepted coating/leak tests, product-quality release and independent signed commissioning acceptance.
Accountable review: Accountable asset owner

A saved draft does not reserve capacity, authorise funding, approve an outage or release a tank. Product demand, customer allocation and reserve effects require a separate operating plan. Demonstrate cleaning, integrity, barrier, quality and commissioning acceptance before release.

Review the tank-conversion handover evidence pack