Demonstration data. Synthetic Marsden Point records as at 28 October 2026, not Channel telemetry, contracts or inspection evidence. Rates and costs are assumptions to confirm with Channel. Connect the terminal management system, historian and SAP PM to replace them.

Assets in the register

70

tanks, line, pumps, arms, ESD, fire

Monetised risk

NZ$2.50M/yr

Σ PoF × CoF across all assets

Top 10 assets carry

43%

of total risk

HI4–HI5 assets

11

material deterioration or worse

Low-confidence assets

45

evidence old or unverified (< 60)

Risk change this week

+NZ$160k/yr

6 assets moved

Tank farm, coloured by the register

Switch between health and risk to see the difference: the worst-condition tanks are not always the riskiest. Click a tank to open its evidence.

DEMO Harbour One · 12 ML Jet
DEMO Harbour Two · 20 ML Diesel
→ Wiri · 170 km DN250 line
Jet / SAF · 38%
Diesel / Biofuels · 50%
Petrol · 54%
Government diesel reserve · 100%
Ex-refinery · 0%
HI1 As newHI2 GoodHI3 DeterioratingHI4 Material deteriorationHI5 End of lifeFlagged
Drag to orbit · scroll to zoom · click a tank · schematic, not surveyed

Colour is condition: floor, shell, coating, inspection currency and settlement. Amber rings mark tanks whose score moved this week.

Highest-risk tanks

7 tanks are HI4 or worse, but 7 of them are empty and carry little risk until they are repurposed.

What changed this week

Recomputed from new evidence, ranked by the risk it added

  • ESD-3 · Kaipara block valve+NZ$60k/yr

    Partial stroke test failed to reach 10% travel

    health 78 → 68 · risk NZ$112k → NZ$173k

  • SEG-02 · km 10–20+NZ$35k/yr

    Third-party excavation reported near Ruakākā and not yet verified (DEMO-W01)

    health 54 → 45 · risk NZ$79k → NZ$115k

  • LA-2 · marine loading arm+NZ$24k/yr

    Weep found at swivel 3 during Jetty 1 discharge

    health 81 → 71 · risk NZ$43k → NZ$67k

  • SEG-08 · km 70–80+NZ$23k/yr

    Three CP test posts fell outside criteria in the Kaipara catchment

    health 46 → 39 · risk NZ$86k → NZ$110k

  • TK-D101 · Diesel / Biofuels+NZ$9k/yr

    External inspection found local internal coating breakdown at the floor-to-shell weld

    health 87 → 80 · risk NZ$22k → NZ$31k

  • P-101 · main transfer pump+NZ$9k/yr

    Vibration up from 3.4 to 4.6 mm/s RMS over seven days

    health 55 → 52 · risk NZ$76k → NZ$84k

Risk matrix

Probability of failure against consequence; bubble size is annual risk. Click a bubble to open the asset.

Common-cause watch

Assets that share design, make, age or protection zone tend to fail the same way. 12 defects point at 42 siblings worth checking · NZ$604k/yr exposure if the cause is shared.

  • Trigger: · Last PST failed to reach 10%

    Shared: Same actuator model, same proof-test procedure.

    Checking costs about NZ$27k. If the cause is shared, sibling failure probability rises by an assumed 50%, worth NZ$138k/yr.

Cohorts (make, model, CP zone, construction era) are DEMO assumptions; age-driven factors and location-specific threats are excluded because they are not common-cause signals.

Register

70 of 70 assets · click any row for the evidence, life range and actions

AssetHealthConf.PoF/yrCoFRisk/yrLife P10·P50·P90Next action

ESD-3 · Kaipara block valve

ESD valve · Kaipara block

68HI3-10.8
822.16%NZ$8.00MNZ$173k

4.2 · 7.8 · 13 yr

Repair actuator; repeat PST

FP-2 · fire water pump

Fire pump · Marsden Point

65HI3
862.34%NZ$6.00MNZ$140k

3.8 · 6.9 · 11 yr

Replace batteries; resume weekly runs

SEG-02 · km 10–20

Pipeline segment · Ruakākā river crossing & settlement

45HI4-9.7
310.88%NZ$13.00MNZ$115k

10 · 28 · 67 yr

Patrol and verify third-party works now

ESD-2 · Ruakākā block valve

ESD valve · Ruakākā block

78HI2
771.4%NZ$8.00MNZ$112k

7.1 · 14 · 25 yr

Complete overdue proof test

SEG-08 · km 70–80

Pipeline segment · Kaipara catchment

39HI5-7
561.04%NZ$10.50MNZ$110k

8.0 · 18 · 38 yr

Plan investigative dig on deepest feature

SEG-17 · km 160–170

Pipeline segment · Auckland urban corridor

45HI4
560.88%NZ$12.00MNZ$106k

10 · 24 · 49 yr

Plan investigative dig on deepest feature

P-101 · main transfer pump

Transfer pump · Marsden pump station

52HI4-3.2
773.83%NZ$2.20MNZ$84k

1.7 · 3.3 · 5.9 yr

Performance test; plan impeller & wear-ring change

ESD-1 · Marsden outlet valve

ESD valve · Marsden outlet

85HI1
821.02%NZ$8.00MNZ$81k

13 · 24 · 41 yr

Routine

ESD-4 · Wiri inlet valve

ESD valve · Wiri inlet

85HI1
821.02%NZ$8.00MNZ$81k

13 · 24 · 41 yr

Routine

TK-R101 · Government diesel reserve

Storage tank · Marsden Point tank farm

80HI2
480.29%NZ$26.00MNZ$74k

99+ · 99+ · 99+ yr

Repair coating at next internal entry

LA-2 · marine loading arm

Loading arm · Jetty 1

71HI2-10.5
811.9%NZ$3.50MNZ$67k

4.9 · 9.4 · 16 yr

Replace swivel 3 seals before next discharge

TK-P105 · Petrol

Storage tank · Marsden Point tank farm

70HI2
480.44%NZ$14.30MNZ$62k

61 · 99+ · 99+ yr

Repair coating at next internal entry

LA-4 · marine loading arm

Loading arm · Jetty 2

73HI2
671.75%NZ$3.50MNZ$61k

5.0 · 11 · 20 yr

Function-test ERC now

FP-1 · fire water pump

Fire pump · Marsden Point

87HI1
860.93%NZ$6.00MNZ$56k

16 · 29 · 48 yr

Routine

TK-P106 · Petrol

Storage tank · Marsden Point tank farm

75HI2
480.36%NZ$14.30MNZ$52k

47 · 99+ · 99+ yr

Bring API 653 internal forward

SEG-16 · km 150–160

Pipeline segment · Auckland urban corridor

65HI3
730.41%NZ$12.00MNZ$49k

27 · 54 · 99 yr

Routine patrol and CP monitoring

TK-D105 · Diesel / Biofuels

Storage tank · Marsden Point tank farm

70HI2
480.44%NZ$11.00MNZ$48k

61 · 99+ · 99+ yr

Repair coating at next internal entry

SEG-14 · km 130–140

Pipeline segment · Rural

58HI3
560.54%NZ$8.50MNZ$46k

15 · 35 · 72 yr

Routine patrol and CP monitoring

LA-1 · marine loading arm

Loading arm · Jetty 1

81HI2
811.23%NZ$3.50MNZ$43k

9.5 · 18 · 31 yr

Routine

LA-3 · marine loading arm

Loading arm · Jetty 2

81HI2
811.23%NZ$3.50MNZ$43k

9.5 · 18 · 31 yr

Routine

Best next inspections

Risk we cannot see clearly (risk × (1 − confidence)) per NZD of inspection. Above 1× the inspection pays for its certainty.

AssetConf.Risk clarifiedCostValue
FP-2 · fire water pump86NZ$20kNZ$4k4.9×
ESD-3 · Kaipara block valve82NZ$31kNZ$9k3.5×
ESD-2 · Ruakākā block valve77NZ$26kNZ$9k2.9×
LA-4 · marine loading arm67NZ$20kNZ$8k2.5×
FP-1 · fire water pump86NZ$8kNZ$4k1.9×
ESD-1 · Marsden outlet valve82NZ$15kNZ$9k1.6×
ESD-4 · Wiri inlet valve82NZ$15kNZ$9k1.6×
P-101 · main transfer pump77NZ$19kNZ$12k1.6×

Heuristic value-of-information ranking. Cheap tests on high-consequence assets (fire pumps, ESD valves, loading arms) beat expensive internals on low-risk tanks.

Health by asset class

How many assets sit in each band

Where the next dollar removes the most risk

Interventions ranked by NZD of annual risk removed per NZD spent. Move the budget to see what it buys.

Spent

NZ$983k

Risk removed

NZ$792k/yr

  • SEG-02 · km 10–20: Patrol and verify third-party works now5.35×
  • FP-2 · fire water pump: Replace batteries; resume weekly runs3.93×
  • ESD-3 · Kaipara block valve: Repair actuator; repeat PST2.01×
  • ESD-2 · Ruakākā block valve: Complete overdue proof test1.31×
  • LA-2 · marine loading arm: Replace swivel 3 seals before next discharge1.17×
  • LA-4 · marine loading arm: Function-test ERC now1.07×
  • P-101 · main transfer pump: Performance test; plan impeller & wear-ring change0.69×
  • SEG-08 · km 70–80: Plan investigative dig on deepest feature0.64×
  • SEG-17 · km 160–170: Plan investigative dig on deepest feature0.62×
  • P-201 · Wiri booster pump: Vibration trend review next quarter0.32×
  • TK-P106 · Petrol: Bring API 653 internal forward0.31×
  • TK-P104 · Petrol: Bring API 653 internal forward0.25×
  • TK-D106 · Diesel / Biofuels: Bring API 653 internal forward0.24×
  • TK-P103 · Petrol: Bring API 653 internal forward0.24×
  • TK-P102 · Petrol: Bring API 653 internal forward0.22×
  • TK-R101 · Government diesel reserve: Repair coating at next internal entry0.22×
  • TK-D104 · Diesel / Biofuels: Bring API 653 internal forward0.20×
  • TK-D103 · Diesel / Biofuels: Bring API 653 internal forward0.18×
  • TK-P105 · Petrol: Repair coating at next internal entry0.17×
  • TK-D102 · Diesel / Biofuels: Bring API 653 internal forward0.17×
  • TK-R102 · Government diesel reserve: Bring API 653 internal forward0.14×
  • TK-D105 · Diesel / Biofuels: Repair coating at next internal entry0.13×
  • TK-P101 · Petrol: Repair coating at next internal entry0.12×
  • TK-J105 · Jet / SAF: Repair coating at next internal entry0.12×
  • TK-D101 · Diesel / Biofuels: Repair coating at next internal entry0.09×
  • TK-J101 · Jet / SAF: Repair coating at next internal entry0.08×
  • TK-X120 · Ex-refinery: Inspect before any repurposing decision0.02×
  • TK-X119 · Ex-refinery: Inspect before any repurposing decision0.02×
  • TK-X118 · Ex-refinery: Inspect before any repurposing decision0.02×
  • TK-X116 · Ex-refinery: Inspect before any repurposing decision0.02×
  • TK-X115 · Ex-refinery: Inspect before any repurposing decision0.02×
  • TK-X114 · Ex-refinery: Inspect before any repurposing decision0.02×
  • TK-X112 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X111 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X117 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X110 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X108 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X113 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X107 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X106 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X104 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X109 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X103 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X102 · Ex-refinery: Inspect before any repurposing decision0.01×
  • TK-X105 · Ex-refinery: Inspect before any repurposing decision0.00×
  • TK-X101 · Ex-refinery: Inspect before any repurposing decision0.00×

The curve flattens: the first NZ$200k removes NZ$425k/yr. Assumes each intervention removes 70% of the asset’s risk.

Method: CNAIM-style health index → probability of failure → × consequence = monetised risk; tank limits follow the API 653 pattern and pipeline segments the API 1160 / ILI pattern. All limits, curve constants, costs and segment values are DEMO assumptions to calibrate with Channel’s inspection data before any engineering use.