Channel Intelligence · Marsden Point Terminal
Asset Health Register
Assets in the register
70
tanks, line, pumps, arms, ESD, fire
Monetised risk
NZ$2.50M/yr
Σ PoF × CoF across all assets
Top 10 assets carry
43%
of total risk
HI4–HI5 assets
11
material deterioration or worse
Low-confidence assets
45
evidence old or unverified (< 60)
Risk change this week
+NZ$160k/yr
6 assets moved
Tank farm, coloured by the register
Switch between health and risk to see the difference: the worst-condition tanks are not always the riskiest. Click a tank to open its evidence.
Colour is condition: floor, shell, coating, inspection currency and settlement. Amber rings mark tanks whose score moved this week.
Highest-risk tanks
7 tanks are HI4 or worse, but 7 of them are empty and carry little risk until they are repurposed.
What changed this week
Recomputed from new evidence, ranked by the risk it added
- ESD-3 · Kaipara block valve+NZ$60k/yr
Partial stroke test failed to reach 10% travel
health 78 → 68 · risk NZ$112k → NZ$173k
- SEG-02 · km 10–20+NZ$35k/yr
Third-party excavation reported near Ruakākā and not yet verified (DEMO-W01)
health 54 → 45 · risk NZ$79k → NZ$115k
- LA-2 · marine loading arm+NZ$24k/yr
Weep found at swivel 3 during Jetty 1 discharge
health 81 → 71 · risk NZ$43k → NZ$67k
- SEG-08 · km 70–80+NZ$23k/yr
Three CP test posts fell outside criteria in the Kaipara catchment
health 46 → 39 · risk NZ$86k → NZ$110k
- TK-D101 · Diesel / Biofuels+NZ$9k/yr
External inspection found local internal coating breakdown at the floor-to-shell weld
health 87 → 80 · risk NZ$22k → NZ$31k
- P-101 · main transfer pump+NZ$9k/yr
Vibration up from 3.4 to 4.6 mm/s RMS over seven days
health 55 → 52 · risk NZ$76k → NZ$84k
Risk matrix
Probability of failure against consequence; bubble size is annual risk. Click a bubble to open the asset.
Common-cause watch
Assets that share design, make, age or protection zone tend to fail the same way. 12 defects point at 42 siblings worth checking · NZ$604k/yr exposure if the cause is shared.
Trigger: · Last PST failed to reach 10%
Shared: Same actuator model, same proof-test procedure.
Checking costs about NZ$27k. If the cause is shared, sibling failure probability rises by an assumed 50%, worth NZ$138k/yr.
Cohorts (make, model, CP zone, construction era) are DEMO assumptions; age-driven factors and location-specific threats are excluded because they are not common-cause signals.
Register
70 of 70 assets · click any row for the evidence, life range and actions
| Asset | Health | Conf. | PoF/yr | CoF | Risk/yr | Life P10·P50·P90 | Next action |
|---|---|---|---|---|---|---|---|
ESD-3 · Kaipara block valve ESD valve · Kaipara block | 68HI3-10.8 | 82 | 2.16% | NZ$8.00M | NZ$173k | 4.2 · 7.8 · 13 yr | Repair actuator; repeat PST |
FP-2 · fire water pump Fire pump · Marsden Point | 65HI3 | 86 | 2.34% | NZ$6.00M | NZ$140k | 3.8 · 6.9 · 11 yr | Replace batteries; resume weekly runs |
SEG-02 · km 10–20 Pipeline segment · Ruakākā river crossing & settlement | 45HI4-9.7 | 31 | 0.88% | NZ$13.00M | NZ$115k | 10 · 28 · 67 yr | Patrol and verify third-party works now |
ESD-2 · Ruakākā block valve ESD valve · Ruakākā block | 78HI2 | 77 | 1.4% | NZ$8.00M | NZ$112k | 7.1 · 14 · 25 yr | Complete overdue proof test |
SEG-08 · km 70–80 Pipeline segment · Kaipara catchment | 39HI5-7 | 56 | 1.04% | NZ$10.50M | NZ$110k | 8.0 · 18 · 38 yr | Plan investigative dig on deepest feature |
SEG-17 · km 160–170 Pipeline segment · Auckland urban corridor | 45HI4 | 56 | 0.88% | NZ$12.00M | NZ$106k | 10 · 24 · 49 yr | Plan investigative dig on deepest feature |
P-101 · main transfer pump Transfer pump · Marsden pump station | 52HI4-3.2 | 77 | 3.83% | NZ$2.20M | NZ$84k | 1.7 · 3.3 · 5.9 yr | Performance test; plan impeller & wear-ring change |
ESD-1 · Marsden outlet valve ESD valve · Marsden outlet | 85HI1 | 82 | 1.02% | NZ$8.00M | NZ$81k | 13 · 24 · 41 yr | Routine |
ESD-4 · Wiri inlet valve ESD valve · Wiri inlet | 85HI1 | 82 | 1.02% | NZ$8.00M | NZ$81k | 13 · 24 · 41 yr | Routine |
TK-R101 · Government diesel reserve Storage tank · Marsden Point tank farm | 80HI2 | 48 | 0.29% | NZ$26.00M | NZ$74k | 99+ · 99+ · 99+ yr | Repair coating at next internal entry |
LA-2 · marine loading arm Loading arm · Jetty 1 | 71HI2-10.5 | 81 | 1.9% | NZ$3.50M | NZ$67k | 4.9 · 9.4 · 16 yr | Replace swivel 3 seals before next discharge |
TK-P105 · Petrol Storage tank · Marsden Point tank farm | 70HI2 | 48 | 0.44% | NZ$14.30M | NZ$62k | 61 · 99+ · 99+ yr | Repair coating at next internal entry |
LA-4 · marine loading arm Loading arm · Jetty 2 | 73HI2 | 67 | 1.75% | NZ$3.50M | NZ$61k | 5.0 · 11 · 20 yr | Function-test ERC now |
FP-1 · fire water pump Fire pump · Marsden Point | 87HI1 | 86 | 0.93% | NZ$6.00M | NZ$56k | 16 · 29 · 48 yr | Routine |
TK-P106 · Petrol Storage tank · Marsden Point tank farm | 75HI2 | 48 | 0.36% | NZ$14.30M | NZ$52k | 47 · 99+ · 99+ yr | Bring API 653 internal forward |
SEG-16 · km 150–160 Pipeline segment · Auckland urban corridor | 65HI3 | 73 | 0.41% | NZ$12.00M | NZ$49k | 27 · 54 · 99 yr | Routine patrol and CP monitoring |
TK-D105 · Diesel / Biofuels Storage tank · Marsden Point tank farm | 70HI2 | 48 | 0.44% | NZ$11.00M | NZ$48k | 61 · 99+ · 99+ yr | Repair coating at next internal entry |
SEG-14 · km 130–140 Pipeline segment · Rural | 58HI3 | 56 | 0.54% | NZ$8.50M | NZ$46k | 15 · 35 · 72 yr | Routine patrol and CP monitoring |
LA-1 · marine loading arm Loading arm · Jetty 1 | 81HI2 | 81 | 1.23% | NZ$3.50M | NZ$43k | 9.5 · 18 · 31 yr | Routine |
LA-3 · marine loading arm Loading arm · Jetty 2 | 81HI2 | 81 | 1.23% | NZ$3.50M | NZ$43k | 9.5 · 18 · 31 yr | Routine |
Best next inspections
Risk we cannot see clearly (risk × (1 − confidence)) per NZD of inspection. Above 1× the inspection pays for its certainty.
| Asset | Conf. | Risk clarified | Cost | Value |
|---|---|---|---|---|
| FP-2 · fire water pump | 86 | NZ$20k | NZ$4k | 4.9× |
| ESD-3 · Kaipara block valve | 82 | NZ$31k | NZ$9k | 3.5× |
| ESD-2 · Ruakākā block valve | 77 | NZ$26k | NZ$9k | 2.9× |
| LA-4 · marine loading arm | 67 | NZ$20k | NZ$8k | 2.5× |
| FP-1 · fire water pump | 86 | NZ$8k | NZ$4k | 1.9× |
| ESD-1 · Marsden outlet valve | 82 | NZ$15k | NZ$9k | 1.6× |
| ESD-4 · Wiri inlet valve | 82 | NZ$15k | NZ$9k | 1.6× |
| P-101 · main transfer pump | 77 | NZ$19k | NZ$12k | 1.6× |
Heuristic value-of-information ranking. Cheap tests on high-consequence assets (fire pumps, ESD valves, loading arms) beat expensive internals on low-risk tanks.
Health by asset class
How many assets sit in each band
Where the next dollar removes the most risk
Interventions ranked by NZD of annual risk removed per NZD spent. Move the budget to see what it buys.
Spent
NZ$983k
Risk removed
NZ$792k/yr
- SEG-02 · km 10–20: Patrol and verify third-party works now5.35×
- FP-2 · fire water pump: Replace batteries; resume weekly runs3.93×
- ESD-3 · Kaipara block valve: Repair actuator; repeat PST2.01×
- ESD-2 · Ruakākā block valve: Complete overdue proof test1.31×
- LA-2 · marine loading arm: Replace swivel 3 seals before next discharge1.17×
- LA-4 · marine loading arm: Function-test ERC now1.07×
- P-101 · main transfer pump: Performance test; plan impeller & wear-ring change0.69×
- SEG-08 · km 70–80: Plan investigative dig on deepest feature0.64×
- SEG-17 · km 160–170: Plan investigative dig on deepest feature0.62×
- P-201 · Wiri booster pump: Vibration trend review next quarter0.32×
- TK-P106 · Petrol: Bring API 653 internal forward0.31×
- TK-P104 · Petrol: Bring API 653 internal forward0.25×
- TK-D106 · Diesel / Biofuels: Bring API 653 internal forward0.24×
- TK-P103 · Petrol: Bring API 653 internal forward0.24×
- TK-P102 · Petrol: Bring API 653 internal forward0.22×
- TK-R101 · Government diesel reserve: Repair coating at next internal entry0.22×
- TK-D104 · Diesel / Biofuels: Bring API 653 internal forward0.20×
- TK-D103 · Diesel / Biofuels: Bring API 653 internal forward0.18×
- TK-P105 · Petrol: Repair coating at next internal entry0.17×
- TK-D102 · Diesel / Biofuels: Bring API 653 internal forward0.17×
- TK-R102 · Government diesel reserve: Bring API 653 internal forward0.14×
- TK-D105 · Diesel / Biofuels: Repair coating at next internal entry0.13×
- TK-P101 · Petrol: Repair coating at next internal entry0.12×
- TK-J105 · Jet / SAF: Repair coating at next internal entry0.12×
- TK-D101 · Diesel / Biofuels: Repair coating at next internal entry0.09×
- TK-J101 · Jet / SAF: Repair coating at next internal entry0.08×
- TK-X120 · Ex-refinery: Inspect before any repurposing decision0.02×
- TK-X119 · Ex-refinery: Inspect before any repurposing decision0.02×
- TK-X118 · Ex-refinery: Inspect before any repurposing decision0.02×
- TK-X116 · Ex-refinery: Inspect before any repurposing decision0.02×
- TK-X115 · Ex-refinery: Inspect before any repurposing decision0.02×
- TK-X114 · Ex-refinery: Inspect before any repurposing decision0.02×
- TK-X112 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X111 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X117 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X110 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X108 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X113 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X107 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X106 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X104 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X109 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X103 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X102 · Ex-refinery: Inspect before any repurposing decision0.01×
- TK-X105 · Ex-refinery: Inspect before any repurposing decision0.00×
- TK-X101 · Ex-refinery: Inspect before any repurposing decision0.00×
The curve flattens: the first NZ$200k removes NZ$425k/yr. Assumes each intervention removes 70% of the asset’s risk.
Method: CNAIM-style health index → probability of failure → × consequence = monetised risk; tank limits follow the API 653 pattern and pipeline segments the API 1160 / ILI pattern. All limits, curve constants, costs and segment values are DEMO assumptions to calibrate with Channel’s inspection data before any engineering use.