Channel Infrastructure · Marsden Point Terminal · DEMO

Protect New Zealand’s fuel lifeline, from Marsden Point tankage to Auckland’s jet supply.

Tank & Fuel Security
DEMO · ML / days
Wiri Pipeline
170 km · 82 barg
Tank Integrity
API 653-style records
Audit Evidence
Certificate of Fitness
Maintenance Value
NZD · Detect → Verify
04

Chapter 04

Platform capabilities

Tailored for Channel Infrastructure · NZX: CHI

Protect the fuel supply. Prove the maintenance value.

3–3.5 bn L
Annual fuel handled
170 km
Marsden Point–Wiri pipeline
2 jetties
Deep-water fuel imports
180 ha
Marsden Point site
Business context supplied in the Channel brief; not independently verified. All operating examples below are DEMO.
Channel stores, tests and pumps customer-owned fuel for bp, Mobil and Z. WOSL and the truck loading rack are customer-owned; Higgins operates its separate bitumen terminal.
Energy Precinct: onboarding the next asset classes →

Inside the platform

The modules operators use every shift

Readiness passport · DEMO — SAG mill reline

Turnaround · release blocked until all mandatory evidence is accepted

Generic demonstration record

Safety & statutory

6/6

Ready

Technical

4/5

Open items

Execution

3/5

Open items

Production

2/2

Ready
Isolation certificate verifiedAccepted
Mill liner set at workfaceInspected · not reserved
Crane operator licenceEvidence expired
PSSR sign-offAwaiting gate

Integrated operating model

Connect the decisions that determine safe, profitable production.

Vessel-to-airport continuity

Connect marine receipts, terminal storage, the Wiri pipeline and customer interfaces without double-counting fuel stocks.

Terminal asset context

Bring tanks, jetties, loading arms, fire systems, pumps and pipeline corridors into one engineering picture.

Tank integrity

Review API 653-style records, thickness trends, settlement, coatings and inspection allowances.

Repurposing readiness

Define tank conversion scope, customer constraints and evidence required for safe return to service.

Maintenance value in NZD

Expose maintenance capex and avoided-outage assumptions, separating estimates from verified savings.

Future asset onboarding

Apply governed handover to SAF, biofuels, LNG and flow-battery asset pathways.

Connected field execution

Keep inspections, patrol findings, defects and accountable work linked to source evidence.

NZ assurance evidence

Organise Certificate of Fitness surveillance evidence and applicable tank, pipeline and environmental requirements.

Chapter 4 of 5

Enter the Command Center

See the decisions protecting production, margin and operational continuity.

Move from fragmented functional reports to a governed resources operating picture with accountable action and verified value.

Open Command Center
Channel × AssetStack · Marsden Point (Te Poupouwhenua) · Demonstration only