Regulator-ready assurance
Assurance Evidence Pack
Generated directly from the live registers — nothing retyped. Pressure-system inspection, TARP monitoring, safety-critical element verification, safety-instrumented function proof testing, containment facility safety and assurance actions, each with its governing requirement and accountable role.
AssetStack — Assurance Evidence Pack
Generated 10/29/2026, 2:38:20 AM. Values are as recorded in the platform at generation time; source records govern. Demonstration records are labelled as such in their names.
Chains live inspection thicknesses (5 pressure systems), IEC 61511 SIF proof tests (0 loops), active MOC/bypass controls (0 records), PSSR readiness gates (0), and project acceptance passports (0) into a deterministic cryptographic digest.
SHA-256 MANIFEST DIGEST: 81e90178ce2d88e9b7e63f701fbde28dd3adfe6f9e469bd0ea839cedfcf1c51b
Pressure systems — inspection and relief register
API 510 / API 570 / API 653 / AS 3788 as applicable · 5 records| Tag | System | Design / inspection code | Min req / last (mm) | Last inspection | Max interval | Relief device / last test | Status | Governing requirement |
|---|---|---|---|---|---|---|---|---|
| DEMO-CI-JT-01 | DEMO · Jetty 1 product transfer line | AS 2885.3 / applicable piping code · confirm basis | 5.8 / 6.1 | 3/16/2026 | 5 y | — | out_of_service | DEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements. |
| DEMO-CI-PL-N01 | DEMO · Northern pipeline review section | AS 2885.3 / applicable piping code · confirm basis | 5.2 / 6.7 | 3/16/2026 | 5 y | — | out_of_service | DEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements. |
| DEMO-CI-PM-01 | DEMO · Pipeline pump manifold | AS 2885.3 / applicable piping code · confirm basis | 6 / 6.9 | 3/16/2026 | 5 y | — | out_of_service | DEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements. |
| DEMO-CI-TK-R101 | DEMO · Reserve tank shell review | API 653-style screening · applicability unconfirmed | 6 / 7.9 | 3/16/2026 | 5 y | — | out_of_service | DEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements. |
| DEMO-CI-TK-X101 | DEMO · Repurposing tank evidence gap | API 653-style screening · applicability unconfirmed | — / 7.8 | 3/16/2026 | 5 y | — | out_of_service | DEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements. |
Trigger action response plans — monitoring currency
Site TARPs / ground control and tailings management plans · 0 recordsNo records registered.
Safety-critical elements — performance-standard verification
Principal hazard / major accident event management plans · 2 records| Element | Hazard | Performance standard | Verification method | Last verified | Next due | Status | Accountable role | Governing requirement |
|---|---|---|---|---|---|---|---|---|
| DEMO-CI-SCE01 · Tank overfill detection | Tank overfill and loss of containment, illustrative major accident scenario | DEMO evidence gap: approved alarm/trip functionality and test criteria must be supplied by the accountable engineer; no SIL claimed. | Review signed proof-test evidence and approved functional test procedure | — | 11/3/2026 | not_assessed | Instrumentation lead | Approved site design and performance standard not attached |
| DEMO-CI-SCE02 · Pipeline emergency isolation | Uncontrolled fuel release following third-party damage, demonstration scenario | DEMO evidence gap: approved isolation philosophy, closure criteria and transient review required; no invented closure time. | Review isolation test record and accountable pipeline engineer assessment | — | 11/12/2026 | not_assessed | Pipeline integrity engineer | Approved pipeline isolation and restart procedure required |
Safety-instrumented functions — proof-test and PFD screening
IEC 61511 · PFDavg screened as λDU × TI / 2; SIL verification governs · 0 recordsNo records registered.
Containment facilities — evaporation pond and bund register
Site HSE codes · engineer of record · 0 recordsNo records registered.
Containment assurance actions
Independent review actions, emergency response drills · 0 recordsNo records registered.
Management of change (MOC), SIF bypasses & PSSR verification
IEC 61511 / OSHA 1910.119 / operator code of practice · Compensating controls & Pre-Startup Safety Review · 0 recordsNo records registered.
Turnaround & operational readiness passports (PSSR & release gates)
Operator operational readiness & PSSR standard · Statutory, design, procedure & competency sign-off · 0 recordsNo records registered.
Project handover & brownfield acceptance passports
ISO 55001 / operator engineering standards · Cryptographically fingerprinted 7-domain acceptance · 0 recordsNo records registered.
OGMP 2.0 Level 5 methane & LDAR source register
OGMP 2.0 Reporting Framework · NZ Climate Change Response Act 2002 · 0 recordsNo records registered.