Regulator-ready assurance

Assurance Evidence Pack

Generated directly from the live registers — nothing retyped. Pressure-system inspection, TARP monitoring, safety-critical element verification, safety-instrumented function proof testing, containment facility safety and assurance actions, each with its governing requirement and accountable role.

AssetStack — Assurance Evidence Pack

Generated 10/29/2026, 2:38:20 AM. Values are as recorded in the platform at generation time; source records govern. Demonstration records are labelled as such in their names.

Statutory Safety Case & Tamper-Evident Cryptographic Seal (SHA-256)

Chains live inspection thicknesses (5 pressure systems), IEC 61511 SIF proof tests (0 loops), active MOC/bypass controls (0 records), PSSR readiness gates (0), and project acceptance passports (0) into a deterministic cryptographic digest.

SHA-256 MANIFEST DIGEST: 81e90178ce2d88e9b7e63f701fbde28dd3adfe6f9e469bd0ea839cedfcf1c51b

Pressure systems — inspection and relief register

API 510 / API 570 / API 653 / AS 3788 as applicable · 5 records
TagSystemDesign / inspection codeMin req / last (mm)Last inspectionMax intervalRelief device / last testStatusGoverning requirement
DEMO-CI-JT-01DEMO · Jetty 1 product transfer lineAS 2885.3 / applicable piping code · confirm basis5.8 / 6.13/16/20265 y—out_of_serviceDEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements.
DEMO-CI-PL-N01DEMO · Northern pipeline review sectionAS 2885.3 / applicable piping code · confirm basis5.2 / 6.73/16/20265 y—out_of_serviceDEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements.
DEMO-CI-PM-01DEMO · Pipeline pump manifoldAS 2885.3 / applicable piping code · confirm basis6 / 6.93/16/20265 y—out_of_serviceDEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements.
DEMO-CI-TK-R101DEMO · Reserve tank shell reviewAPI 653-style screening · applicability unconfirmed6 / 7.93/16/20265 y—out_of_serviceDEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements.
DEMO-CI-TK-X101DEMO · Repurposing tank evidence gapAPI 653-style screening · applicability unconfirmed— / 7.83/16/20265 y—out_of_serviceDEMO only; confirm approved design minimum, inspection plan and applicable NZ requirements.

Trigger action response plans — monitoring currency

Site TARPs / ground control and tailings management plans · 0 records

No records registered.

Safety-critical elements — performance-standard verification

Principal hazard / major accident event management plans · 2 records
ElementHazardPerformance standardVerification methodLast verifiedNext dueStatusAccountable roleGoverning requirement
DEMO-CI-SCE01 · Tank overfill detectionTank overfill and loss of containment, illustrative major accident scenarioDEMO evidence gap: approved alarm/trip functionality and test criteria must be supplied by the accountable engineer; no SIL claimed.Review signed proof-test evidence and approved functional test procedure—11/3/2026not_assessedInstrumentation leadApproved site design and performance standard not attached
DEMO-CI-SCE02 · Pipeline emergency isolationUncontrolled fuel release following third-party damage, demonstration scenarioDEMO evidence gap: approved isolation philosophy, closure criteria and transient review required; no invented closure time.Review isolation test record and accountable pipeline engineer assessment—11/12/2026not_assessedPipeline integrity engineerApproved pipeline isolation and restart procedure required

Safety-instrumented functions — proof-test and PFD screening

IEC 61511 · PFDavg screened as λDU × TI / 2; SIL verification governs · 0 records

No records registered.

Containment facilities — evaporation pond and bund register

Site HSE codes · engineer of record · 0 records

No records registered.

Containment assurance actions

Independent review actions, emergency response drills · 0 records

No records registered.

Management of change (MOC), SIF bypasses & PSSR verification

IEC 61511 / OSHA 1910.119 / operator code of practice · Compensating controls & Pre-Startup Safety Review · 0 records

No records registered.

Turnaround & operational readiness passports (PSSR & release gates)

Operator operational readiness & PSSR standard · Statutory, design, procedure & competency sign-off · 0 records

No records registered.

Project handover & brownfield acceptance passports

ISO 55001 / operator engineering standards · Cryptographically fingerprinted 7-domain acceptance · 0 records

No records registered.

OGMP 2.0 Level 5 methane & LDAR source register

OGMP 2.0 Reporting Framework · NZ Climate Change Response Act 2002 · 0 records

No records registered.