| Barrier | Hazard | State | Basis | Due / last | Owner |
|---|---|---|---|---|---|
DEMO-CI-SCE02 · Pipeline emergency isolation Critical control · DEMO · Marsden Point–Wiri corridor | Uncontrolled fuel release following third-party damage, demonstration scenario | unverified | No verification recorded | 2026-11-12 | Pipeline integrity engineer |
DEMO-CI-SCE01 · Tank overfill detection Critical control · DEMO · Marsden Point Terminal | Tank overfill and loss of containment, illustrative major accident scenario | unverified | No verification recorded | 2026-11-03 | Instrumentation lead |
DEMO · Repurposing tank evidence gap (DEMO-CI-TK-X101) Pressure containment · DEMO · Marsden Point Terminal | Loss of containment: Damage mechanism unconfirmed | effective | Above retirement thickness | 2031-03-15 | Tank integrity engineer |
DEMO · Pipeline pump manifold (DEMO-CI-PM-01) Pressure containment · DEMO · Marsden Point Terminal | Loss of containment: Localised corrosion | effective | Above retirement thickness | 2031-03-15 | Pipeline integrity engineer |
DEMO · Reserve tank shell review (DEMO-CI-TK-R101) Pressure containment · DEMO · Marsden Point Terminal | Loss of containment: External coating breakdown | effective | Above retirement thickness | 2031-03-15 | Tank integrity engineer |
DEMO · Jetty 1 product transfer line (DEMO-CI-JT-01) Pressure containment · DEMO · Marsden Point Terminal | Loss of containment: Marine atmospheric corrosion | effective | Above retirement thickness | 2031-03-15 | Pipeline integrity engineer |
DEMO · Northern pipeline review section (DEMO-CI-PL-N01) Pressure containment · DEMO · Marsden Point–Wiri corridor | Loss of containment: External corrosion / coating damage | effective | Above retirement thickness | 2031-03-15 | Pipeline integrity engineer |
An unverified barrier is not treated as effective. States are derived from recorded verification dates, proof tests, TARP levels and thickness measurements against each record's own frequency and limits. The site's safety case, major hazard management plan and engineer-of-record instructions take precedence.