Risk & Assurance
Pipeline Corridor Twin
Projection: today
0 of 3 segments below retirement thickness
de Waard-Milliams Sour Gas (CO₂ / H₂S) & CUI Process-Coupled Kinetics
Couples process telemetry (Temperature, pCO₂ partial pressure, H₂S sour service, and CUI insulation moisture) to dynamically recalculate wall-loss rates and RBI inspection shifts.
| Segment / Circuit | Baseline Rate | Process-Coupled Rate | Baseline RUL | Coupled RUL | RBI Inspection Shift |
|---|---|---|---|---|---|
| DEMO · Jetty 1 product transfer line (DEMO-CI-JT-01) | 0.12 mm/yr | 1.39 mm/yr | 2.4 yr | 0.2 yr | Pull forward 26 mo |
| DEMO · Northern pipeline review section (DEMO-CI-PL-N01) | 0.12 mm/yr | 1.39 mm/yr | 12 yr | 1.1 yr | Pull forward 131 mo |
| DEMO · Pipeline pump manifold (DEMO-CI-PM-01) | 0.12 mm/yr | 1.39 mm/yr | 7.2 yr | 0.6 yr | Pull forward 79 mo |
Wall-Thickness Degradation Trajectories vs. Retirement Limit
Cursor: +0yRemaining Corrosion Allowance Matrix (% of Design Allowance)
≤0% = At or below retirement wallDEMO · Jetty 1 product transfer line · DEMO-CI-JT-01
6.02 mm / min 5.8 mm
Marine atmospheric corrosion · 0.12 mm/yr (two-point rate) · measured 2026-03-16 · DEMO · Marsden Point Terminal
DEMO · Northern pipeline review section · DEMO-CI-PL-N01
6.62 mm / min 5.2 mm
External corrosion / coating damage · 0.12 mm/yr (two-point rate) · measured 2026-03-16 · DEMO · Marsden Point–Wiri corridor
DEMO · Pipeline pump manifold · DEMO-CI-PM-01
6.82 mm / min 6 mm
Localised corrosion · 0.12 mm/yr (two-point rate) · measured 2026-03-16 · DEMO · Marsden Point Terminal
Linear projection from the last measured thickness at the two-point or engineer-override corrosion rate. Bar shows remaining corrosion allowance between nominal and retirement thickness. Not a substitute for ILI defect assessment (B31G / RSTRENG) or engineer-of-record fitness-for-service.