Gas Transmission, Distribution & Pressure Systems

Pipeline & Pressure Integrity Assurance

Repair-aware ILI-to-ILI hierarchical Bayesian corrosion growth forecaster, physics-informed burst pressure ("Days Until Dig"), dig verification unity plots, and statutory pressure-system register. Configurable for AS 2885, 49 CFR 192 / ASME B31.8S, IGEM/TD/1 and EN 1594.

ADNOC GAS CORRIDOR VISUAL TWIN
Habshan 5 → Bab → Maqta / Ruwais 36" X65 Sales & NGL Trunkline

Multi-Layer Pipeline Integrity, Bayesian ILI Growth & Burst-Pressure Visual Command

Click any girth-weld anomaly along the 45 km Habshan–Ruwais alignment strip below to inspect its 360° clock-position wall loss, 3-run Bayesian shrinkage trajectory, Modified B31G / RSTRENG / DNV-RP-F101 burst envelope, and bellhole ultrasonic dig verification.

KM 0.0 · HABSHAN 5 BOOSTER (K-101A)KM 14–20 · SABKHA SALINE & 400kV AC CORRIDORKM 27 · WADI SCOURKM 34 · INDUSTRIAL HCAKM 45.0 · RUWAIS / MAQTA TERMINAL

360° Pipe Cross-Section & Clock Orientation

Clock 05:30

ILI-GW1040-0530 · GW 1040 (Spread-2 Sabkha Crossing)

12:0003:0006:00 (BOL)09:0056% WT7.11 / 12.7 mm
Bayesian Rate0.421 mm/yr (3.31%/yr)
Days Until Dig0 days (2026-10-13)
Burst P_fail / FPR10.5 MPa (FPR 1.03)
PIR & HCA Class291 m · Class 3 HCA

ILI-to-ILI Matched Growth Trajectory: Hierarchical Bayes vs. Naive Differencing (ILI-GW1040-0530)

Pools noisy ±10% WT MFL runs with Coal-Tar Enamel / Saline Sabkha Clay cohort priors and projects exact breach of the 80% WT & burst threshold.

Field UT Dig Verified: 57.5% WT
2018 (ILI-1)2022 (ILI-2)2026 (ILI-3)2028 (+2yr)2030 (ILI-4)0%25%50%75%100%80% WT Statutory Limit
  • P10–P90 Bayesian Credible Fan (%WT)
  • Hierarchical Bayesian Trajectory (%WT)
  • Naive 2-Point Differencing (%WT)
  • Bellhole AUT Field Verification (%WT)
Co-Located Threat Attribution: AC interference corridor (400 kV parallel) + low-CP sabkha dipYears to 80% WT: 7.24 yr · Years to FPR < 1.39: 0 yr

Physics-Informed Burst-Pressure Failure Envelope (P_fail vs. Defect Length L)

Compares Modified B31G (0.85dL), RSTRENG Effective Area, and DNV-RP-F101 at ILI-GW1040-0530 depth (56% WT) against MAOP (10.2 MPa).

L = 185 mm
50 mm100 mm150 mm185 mm210 mm240 mm300 mm400 mm6 MPa10 MPa14 MPa18 MPa22 MPaMAOP (10.2 MPa)1.39×MAOP Dig Trigger
  • DNV-RP-F101 (UTS)
  • RSTRENG Effective Area
  • Modified ASME B31G (0.85dL)

Field-Verified Dig Unity Plot (ILI MFL Call vs. Bellhole Ultrasonic Depth)

Gate 3 Field Verification across 6 ADNOC corridor validation digs (RMSE ±1.17% WT, 100% within ±10% MFL confidence bounds).

100% In ±10% Band
10%30%50%80%4%24%44%80%
  • y = x Unity Line
  • +10% WT MFL Spec
  • -10% WT MFL Spec
  • Field Bellhole AUT Verified (%WT)
LAYER 1 + LAYER 2 HERO DEMO
Public PHMSA-Style 3-Run ILI Benchmark

Repair-Aware ILI-to-ILI Bayesian Corrosion Forecaster & Burst-Pressure Dig Clock

Box-matches anomalies by girth weld, odometer chainage and clock orientation across 2018, 2022 and 2026 MFL runs, detects sleeve/recoat cycle resets, pools noisy ±10% WT MFL calls via Hierarchical Bayes, and couples growth to burst pressure.

Shortest Time to Dig

0 days

ILI-GW1040-0530 (2026-10-13)

Immediate / Scheduled Digs

5 / 0

Target FPR ≥ 1.39×MAOP

Repair Cycle Resets

1

Sleeve/recoat jump isolated from rate

Holdout ILI Run 3 MAE

1.92% WT

vs 2.7% Naive (29% noise reduction)

Field Dig Unity RMSE

±1.17% WT

100% within ±10% MFL spec

ILI-to-ILI Box-Matched Anomalies — Ranked by "Days Until This Anomaly Needs a Dig"

36" OD (914.4 mm) × 12.7 mm WT · API 5L X65 (SMYS 448 MPa) · MAOP 10.20 MPa · Active Code: 49 CFR 192 + ASME B31.8S (US PHMSA) · Burst Model: Modified ASME B31G (0.85dL)

Anomaly / Weld / ClockILI Depth History (%WT)Bayesian Rate & Next ILIBurst P_fail & FPRYears to 80% WT / FPRDays Until Dig RequiredGoverned Action
ILI-GW1040-0530
GW 1040 · 14.82 km · Clock 05:30
Coal-Tar Enamel · Saline Sabkha Clay
2018: 28%
2022: 41.5%
2026 (Current): 56% (7.11 mm)
Length: 185 mm
0.421 mm/yr (3.31%/yr)
Raw diff: 3.63%/yr
Next ILI (+4yr): 69.3% WT
P_fail: 10.5 MPa
FPR: 1.03×MAOP
Safe P_op: 7.55 MPa
Class 3 HCA · PIR 291 m
To 80% WT: 7.24 yr
To FPR < 1.39: 0 yr
TVC MAOP Score: 94%
0 days
By 2026-10-13
Immediate — Hard-Gated Human Review

AC interference corridor (400 kV parallel) + low-CP sabkha dip

ILI-GW1185-0600
GW 1185 · 18.45 km · Clock 06:00
PE Tape · Seasonal Wet Loam
2018: 36%
2022: 52%
2026 (Current): 69.5% (8.83 mm)
Length: 240 mm
0.501 mm/yr (3.95%/yr)
Raw diff: 4.38%/yr
Next ILI (+4yr): 85.3% WT
P_fail: 8.33 MPa
FPR: 0.82×MAOP
Safe P_op: 5.99 MPa
Class 3 HCA · PIR 291 m
To 80% WT: 2.66 yr
To FPR < 1.39: 0 yr
TVC MAOP Score: 76%
0 days
By 2026-10-13
Immediate — Hard-Gated Human Review

Cased road crossing + disbanded PE tape shielding CP

ILI-GW1210-0430
GW 1210 · 19.12 km · Clock 04:30
Coal-Tar Enamel · Saline Sabkha Clay
Type-B Sleeve & Epoxy Recoat (2022-11)
2018: 44%
2022: 61%
2026 (Current): 14% (1.78 mm)
Length: 150 mm
0.123 mm/yr (0.97%/yr)
Raw diff: 1%/yr
Next ILI (+4yr): 17.9% WT
P_fail: 13.75 MPa
FPR: 1.35×MAOP
Safe P_op: 9.89 MPa
Class 2 · PIR 291 m
To 80% WT: 68.23 yr
To FPR < 1.39: 0 yr
TVC MAOP Score: 98%
0 days
By 2026-10-13
Post-Repair Reset Cycle

Remediated in 2022 via Clock-Spring composite sleeve (Cycle Reset)

ILI-GW1420-0730
GW 1420 · 27.6 km · Clock 07:30
FBE · Well-Drained Sand
2018: 19%
2022: 31%
2026 (Current): 33.5% (4.25 mm)
Length: 130 mm
0.173 mm/yr (1.36%/yr)
Raw diff: 0.63%/yr
Next ILI (+4yr): 38.9% WT
P_fail: 12.94 MPa
FPR: 1.27×MAOP
Safe P_op: 9.31 MPa
Class 1 · PIR 291 m
To 80% WT: 34.14 yr
To FPR < 1.39: 0 yr
TVC MAOP Score: 92%
0 days
By 2026-10-13
Immediate — Hard-Gated Human Review

Wadi flood scour & thermal cycling zone

ILI-GW1590-0500
GW 1590 · 34.08 km · Clock 05:00
PE Tape · Seasonal Wet Loam
2018: 31%
2022: 46.5%
2026 (Current): 63% (8 mm)
Length: 210 mm
0.487 mm/yr (3.84%/yr)
Raw diff: 4.13%/yr
Next ILI (+4yr): 78.3% WT
P_fail: 9.44 MPa
FPR: 0.93×MAOP
Safe P_op: 6.79 MPa
Class 4 HCA · PIR 291 m
To 80% WT: 4.43 yr
To FPR < 1.39: 0 yr
TVC MAOP Score: 68%
0 days
By 2026-10-13
Immediate — Hard-Gated Human Review

Rectifier RT-04 outage zone + stray DC traction current

ILI-GW1740-0615
GW 1740 · 41.9 km · Clock 06:15
3LPE · Calcareous Gravel
2018: 12%
2022: 16.5%
2026 (Current): 20.5% (2.6 mm)
Length: 95 mm
0.133 mm/yr (1.05%/yr)
Raw diff: 1%/yr
Next ILI (+4yr): 24.7% WT
P_fail: 13.84 MPa
FPR: 1.36×MAOP
Safe P_op: 9.96 MPa
Class 2 · PIR 291 m
To 80% WT: 56.61 yr
To FPR < 1.39: 0 yr
TVC MAOP Score: 99%
0 days
By 2026-10-13
Immediate — Hard-Gated Human Review

Nominal baseline segment