Channel × AssetStack · Marsden Point Terminal
Terminal & customer interfaces · handover evidence
Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
4 loaded of 4 · calculations apply to loaded records
Requirements in selected pack
8
Illustrative sources, not accepted
1
Missing source records
7
DEMO-CI-H02 · No verified acceptance
Ex-refinery tank conversion · DEMO-TK-X101
17.5 ML synthetic repurposing tank. Product compatibility, outage, customer allocation and cleaning scope are unapproved; allowances do not authorise expenditure or tank release.
Illustrative source only · Asset identity snapshot
- Review reference
- Equipment master / DEMO snapshot
- Acceptance to demonstrate
- Replace the synthetic master with verified tag, drawings, materials, ownership and location data before acceptance.
- Accountable reviewer
- Asset data owner
- Source
- Equipment 6ae23fbd0022dda0580cbff0, specifications.channel_tank. Synthetic only; no accepted field evidence.
Missing source · Controlled design and as-built drawings
- Review reference
- Approved design and project specification
- Acceptance to demonstrate
- Verify asset identity, approved drawings, weld/NDT and design changes against the actual installed scope.
- Accountable reviewer
- Design authority
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Inspection and structural baseline
- Review reference
- API 653-style review; confirm applicability
- Acceptance to demonstrate
- Accept calibrated thickness/NDT and settlement evidence against the approved minimum thickness and settlement criteria.
- Accountable reviewer
- Tank integrity engineer
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Overfill and fire-system proof tests
- Review reference
- API 2350 / site fire-safety basis, as applicable
- Acceptance to demonstrate
- Retain witnessed barrier tests, setpoint checks and defect close-out against approved requirements.
- Accountable reviewer
- Process-safety engineer
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Cleaning, isolation and leak tests
- Review reference
- Approved site commissioning and isolation procedures
- Acceptance to demonstrate
- Confirm cleaning/gas-free evidence, permits, leak tests and signed mechanical completion before introducing product.
- Accountable reviewer
- Commissioning lead
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Product quality and segregation
- Review reference
- Customer fuel specification and approved release procedure
- Acceptance to demonstrate
- Accept fuel qualification, contamination controls and independent product-quality release for intended service.
- Accountable reviewer
- Product quality lead
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Maintenance and critical spares
- Review reference
- Site asset-management strategy / ISO 55001 review
- Acceptance to demonstrate
- Approve maintenance tasks, inspection intervals, spares applicability and procurement readiness.
- Accountable reviewer
- Maintenance lead
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Independent acceptance and monitoring baseline
- Review reference
- Approved delegation and commissioning acceptance plan
- Acceptance to demonstrate
- Obtain distinct accountable owner and independent approver sign-off; retain accepted baseline and post-start monitoring plan.
- Accountable reviewer
- Accountable asset owner
- Source
- Not supplied. No inspected document or accepted result is attached.
Asset reference: DEMO-TK-X101 · Snapshot: 2026-10-28 · Pack record: 6ae2416a2d7be82dac22c41c. References indicate review topics, not proof of applicability or certification.
From a DEMO checklist to governed acceptance
These public packs contain synthetic scope and missing-evidence requirements only. They are not approved handovers, audit evidence or authority to operate. Actual passports use the existing administrator workspace with distinct nominated owner and independent approver, source-linked reviews and commissioning acceptance.
Final signed acceptance creates a stored evidence snapshot and requires integration credits; these public checklists and private planning drafts do not.