Channel × AssetStack · Marsden Point Terminal
Terminal & customer interfaces · handover evidence
Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
4 loaded of 4 · calculations apply to loaded records
Requirements in selected pack
8
Illustrative sources, not accepted
0
Missing source records
8
DEMO-CI-H03 · No verified acceptance
Higgins bitumen terminal · interface boundary
Interface review only. Higgins owns its separate terminal; this pack does not transfer ownership or certify Higgins assets as Channel assets. No actual interface agreement has been supplied.
Missing source · Ownership and interface agreement
- Review reference
- Signed interface and operating agreements
- Acceptance to demonstrate
- Define custody, isolation, emergency, maintenance and assurance responsibilities on both sides.
- Accountable reviewer
- Channel / Higgins interface owners
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Connection drawings and isolation boundaries
- Review reference
- Approved P&IDs and battery-limit register
- Acceptance to demonstrate
- Verify physical tie-in, valves, metering and operator responsibilities against controlled as-builts.
- Accountable reviewer
- Interface engineer
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Hot-product and fire hazards
- Review reference
- Approved process-safety / fire risk assessment
- Acceptance to demonstrate
- Agree operating limits, thermal hazards, containment and emergency actions from an approved risk assessment.
- Accountable reviewer
- Process-safety lead
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Consent and environmental responsibilities
- Review reference
- Applicable RMA / Northland Regional Council consent conditions
- Acceptance to demonstrate
- Identify applicable consent holders and demonstrate containment, discharge and reporting obligations.
- Accountable reviewer
- Environment lead
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Product custody and metering
- Review reference
- Customer specification and custody-transfer requirements
- Acceptance to demonstrate
- Accept calibration, sampling and product-release arrangements at the interface.
- Accountable reviewer
- Product quality lead
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Emergency response and communications
- Review reference
- Site emergency and mutual-aid plans
- Acceptance to demonstrate
- Retain coordinated exercise evidence and tested contacts without assuming shared ownership.
- Accountable reviewer
- Emergency response lead
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Maintenance and change management
- Review reference
- Approved interface MOC and maintenance procedures
- Acceptance to demonstrate
- Agree joint isolation, planned-work notice and engineering-change approval requirements.
- Accountable reviewer
- Maintenance / interface leads
- Source
- Not supplied. No inspected document or accepted result is attached.
Missing source · Independent interface acceptance
- Review reference
- Signed delegation and interface acceptance plan
- Acceptance to demonstrate
- Retain separate accountable acceptance for each party and clear open-item ownership.
- Accountable reviewer
- Accountable interface owners
- Source
- Not supplied. No inspected document or accepted result is attached.
Asset reference: Higgins interface · separately owned facility · Snapshot: 2026-10-28 · Pack record: 6ae2416a2d7be82dac22c41d. References indicate review topics, not proof of applicability or certification.
From a DEMO checklist to governed acceptance
These public packs contain synthetic scope and missing-evidence requirements only. They are not approved handovers, audit evidence or authority to operate. Actual passports use the existing administrator workspace with distinct nominated owner and independent approver, source-linked reviews and commissioning acceptance.
Final signed acceptance creates a stored evidence snapshot and requires integration credits; these public checklists and private planning drafts do not.