Skip to page content
Channel × AssetStack · Marsden Point Terminal

Terminal & customer interfaces · handover evidence

Whangārei Harbour · Ruakākā · Pacific/Auckland · NZDT (UTC+13 at demo snapshot)
Terminal Command
DEMO · Synthetic operating records as at 28 October 2026. Not live telemetry, actual contracts, inspection evidence or operational authority.
4 loaded of 4 · calculations apply to loaded records
Requirements in selected pack
8
Illustrative sources, not accepted
0
Missing source records
8
DEMO-CI-H03 · No verified acceptance

Higgins bitumen terminal · interface boundary

Interface review only. Higgins owns its separate terminal; this pack does not transfer ownership or certify Higgins assets as Channel assets. No actual interface agreement has been supplied.

Missing source · Ownership and interface agreement
Review reference
Signed interface and operating agreements
Acceptance to demonstrate
Define custody, isolation, emergency, maintenance and assurance responsibilities on both sides.
Accountable reviewer
Channel / Higgins interface owners
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Connection drawings and isolation boundaries
Review reference
Approved P&IDs and battery-limit register
Acceptance to demonstrate
Verify physical tie-in, valves, metering and operator responsibilities against controlled as-builts.
Accountable reviewer
Interface engineer
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Hot-product and fire hazards
Review reference
Approved process-safety / fire risk assessment
Acceptance to demonstrate
Agree operating limits, thermal hazards, containment and emergency actions from an approved risk assessment.
Accountable reviewer
Process-safety lead
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Consent and environmental responsibilities
Review reference
Applicable RMA / Northland Regional Council consent conditions
Acceptance to demonstrate
Identify applicable consent holders and demonstrate containment, discharge and reporting obligations.
Accountable reviewer
Environment lead
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Product custody and metering
Review reference
Customer specification and custody-transfer requirements
Acceptance to demonstrate
Accept calibration, sampling and product-release arrangements at the interface.
Accountable reviewer
Product quality lead
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Emergency response and communications
Review reference
Site emergency and mutual-aid plans
Acceptance to demonstrate
Retain coordinated exercise evidence and tested contacts without assuming shared ownership.
Accountable reviewer
Emergency response lead
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Maintenance and change management
Review reference
Approved interface MOC and maintenance procedures
Acceptance to demonstrate
Agree joint isolation, planned-work notice and engineering-change approval requirements.
Accountable reviewer
Maintenance / interface leads
Source
Not supplied. No inspected document or accepted result is attached.
Missing source · Independent interface acceptance
Review reference
Signed delegation and interface acceptance plan
Acceptance to demonstrate
Retain separate accountable acceptance for each party and clear open-item ownership.
Accountable reviewer
Accountable interface owners
Source
Not supplied. No inspected document or accepted result is attached.
Asset reference: Higgins interface · separately owned facility · Snapshot: 2026-10-28 · Pack record: 6ae2416a2d7be82dac22c41d. References indicate review topics, not proof of applicability or certification.

From a DEMO checklist to governed acceptance

These public packs contain synthetic scope and missing-evidence requirements only. They are not approved handovers, audit evidence or authority to operate. Actual passports use the existing administrator workspace with distinct nominated owner and independent approver, source-linked reviews and commissioning acceptance.

Final signed acceptance creates a stored evidence snapshot and requires integration credits; these public checklists and private planning drafts do not.