Live Gas Network
7,720 MMscfd
Delivered across 8 trunklines · DEMO stream
Constraint Throughput
Plan Attainment
Portfolio Value at Stake
Critical Assets
Pending Decisions
Unified Causal Spine
DETECT → DIAGNOSE → DECIDE → VERIFYDecision Queue
2 proposed actions awaiting approval
DEMO-CI-D01 · Review TK-J101 coating scope
Review inspection evidence and coating extent before committing the assumed NZ$180,000 renewal allowance.
DEMO-CI-D02 · Confirm seal procurement and intervention window
Verify stock and OEM compatibility, obtain the supplier lead-time confirmation and agree the permitted intervention window.
Critical Spares Coupled to ILI Burst-Pressure Dig Clocks & Rotating Weibull P10 Windows
Compares supplier procurement lead time directly against the physics-informed failure horizon (Weibull P10 RUL & Modified B31G / DNV-RP-F101 "Days Until Dig").
$4,820/day fuel-gas heat-rate penalty + 64h unplanned train outage ($2.12M margin at risk)
FPR 1.24 < 1.39 ASME B31.8S Class 3 HCA limit (PIR 319 m) — immediate pressure derate or bellhole sleeve
1.12 mm/yr CO₂/H₂S wall-loss rate toward 6.2 mm ASME VIII Div 1 retirement limit (111-day buffer)
Multi-Layer Pipeline Integrity, Bayesian ILI Growth & Burst-Pressure Visual Command
Click any girth-weld anomaly along the 45 km Habshan–Ruwais alignment strip below to inspect its 360° clock-position wall loss, 3-run Bayesian shrinkage trajectory, Modified B31G / RSTRENG / DNV-RP-F101 burst envelope, and bellhole ultrasonic dig verification.
360° Pipe Cross-Section & Clock Orientation
ILI-GW1040-0530 · GW 1040 (Spread-2 Sabkha Crossing)
ILI-to-ILI Matched Growth Trajectory: Hierarchical Bayes vs. Naive Differencing (ILI-GW1040-0530)
Pools noisy ±10% WT MFL runs with Coal-Tar Enamel / Saline Sabkha Clay cohort priors and projects exact breach of the 80% WT & burst threshold.
- P10–P90 Bayesian Credible Fan (%WT)
- Hierarchical Bayesian Trajectory (%WT)
- Naive 2-Point Differencing (%WT)
- Bellhole AUT Field Verification (%WT)
Physics-Informed Burst-Pressure Failure Envelope (P_fail vs. Defect Length L)
Compares Modified B31G (0.85dL), RSTRENG Effective Area, and DNV-RP-F101 at ILI-GW1040-0530 depth (56% WT) against MAOP (10.2 MPa).
- DNV-RP-F101 (UTS)
- RSTRENG Effective Area
- Modified ASME B31G (0.85dL)
Field-Verified Dig Unity Plot (ILI MFL Call vs. Bellhole Ultrasonic Depth)
Gate 3 Field Verification across 6 ADNOC corridor validation digs (RMSE ±1.17% WT, 100% within ±10% MFL confidence bounds).
- y = x Unity Line
- +10% WT MFL Spec
- -10% WT MFL Spec
- Field Bellhole AUT Verified (%WT)
Wellhead-to-LNG Gas Processing & Pipeline Train Chain
0 gas/NGL trains & trunklines · Natural Gas / NGL / LNG
Risk by Location
2 locationsRanked Gas Operations & Pipeline Integrity Priorities
Highest-consequence process-safety controls, train constraints, spare collisions, and governed decisions requiring attention
DEMO · Transfer-pump mechanical seal kit stock exposure
critical0 on hand · 21-day lead time · minimum 1
DEMO · Pipeline-pump bearing kit stock exposure
high1 on hand · 35-day lead time · minimum 2
DEMO-CI-D01 · Review TK-J101 coating scope
mediumDecision awaiting approval · 0% confidence
DEMO-CI-D02 · Confirm seal procurement and intervention window
mediumDecision awaiting approval · 0% confidence